青岛地铁6号线装配式地铁车站大型异形PC构件制造技术 被引量:4

Manufacturing technology of large deformed concrete prefabricated components in Qingdao metro line 6
在线阅读 下载PDF
导出
摘要 依托全国首座全方位装配式地铁车站——青岛地铁6号线工程实例,针对预制构件生产过程存在的高强高性能混凝土配合比、大型构件蒸养、异形构件翻转等技术难点,对大型混凝土构件生产工艺及设备进行全面系统的研究,并采取一系列措施,以有效避免超大、异形预制构件出现温度裂缝和贯穿裂缝,并使其达到设计、生产及应用的要求。 Relying on the national first all-round prefabricated subway station Qingdao Metro Line 6 project example,in response to the technical dificulties in the production process of prefabricated components,such as high-strength and highperformance concrete mix ratio,large-scale component steam curing,and special-shaped component flipping,a comprehensive and systematic study was conducted on the production process and equipment of large-scale concrete components,and a series of measures were taken to effectively avoid the possibility of temperature cracks and penetrating cracks in oversized and special-shaped prefabricated components,and to meet the requirements of design,production,and application.
作者 张全昌 陈烨 穆鹏雪 安良梅 于海鹏 Zhang Quanchang;Chen Ye;Mu Pengxue
出处 《现代城市轨道交通》 2023年第9期74-80,共7页 Modern Urban Transit
关键词 地铁 装配式车站 预制构件 技术难点 质量控制 metro prefabricated station prefabricated components technical difficulties quality control
作者简介 第一作者:张全昌,男,工程师;通信作者:陈烨,女,高级工程师。