预应力连续梁悬拼施工关键技术研究与应用 被引量:8

Study and Application of Key Technology for Cantilever Erection Construction of Prestressed Continuing Box-girder Bridge
在线阅读 下载PDF
导出
摘要 基于高精度几何线形控制和大型机械化集成装备系统施工的节段预制桥梁悬拼技术,已广泛用于国内外桥梁施工。根据厄瓜多尔国家联合大桥(巴巴奥约河大桥)75 m跨径连续梁桥的工程特点,采用有限元法计算全桥预拱度,采用GeomPro软件控制与调整几何线形,介绍JP75架桥机、水上龙门吊、悬臂支架锁定、长束张拉、强制合龙及体系转换等关键设备与施工技术的研究与应用。 The technique for cantilever erection based on control of precision geometry profile and construction with mechanization and integrated equipment system has been widely applied in precast segmental bridge construction.In this paper,according to the characteristics of the continuous structure of span 75m of National United Bridge(Babahoyo River Bridge) in Ecuador,the camber of segment is computed by Finite Element Method and the precision of geometry profile is controlled and correct by using GeomPro software.The study and application of the key equipments and technology for cantilever erection construction such as overhead launching gantry-JP75,gantry crane on river,cantilever temporary fixity,tensioning of long prestressed tendon,mandatory closure and system conversion,etc are presented.
作者 凌忠 蒋严波
出处 《公路工程》 北大核心 2012年第3期51-56,共6页 Highway Engineering
基金 广西壮族自治区交通科技项目计划(20099520)
关键词 预应力连续梁 上行式架桥机 悬拼技术 结构体系转换 预拱度 几何线形控制 Prestressed continuing box-girder Overhead launching gantry Cantilever erection method Structural system conversion Camber Geometry and profile control
作者简介 凌忠(1970-),男,湖南长沙人,高级工程师,主要从事公路桥梁建设与管理工作
  • 相关文献

参考文献8

  • 1Pothecary C. H. , Brindle L.. Torridge Bridge Erection of Superstructure[J]. ICE Proceeding, 1990, 88 (2 - 1 ) :233 - 260.
  • 2Harfidge, Steve. Launching Gantries for Building Pre-cast Segmental Balanced Cantilever Bridge[ J]. Structural Engi- neering International, 2011,21 (4) : 407 -412.
  • 3Meyer, Max. Under-Slung and overhead Gantries for Span by Span Erection of precast Segmental Bridge Decks [ J ]. Structural Engineering International, 2011, 21 ( 4 ) : 407 - 412.
  • 4王艳,赵志有.悬臂拼装施工的连续梁桥制造与施工预拱度的确定[J].郑州大学学报(理学版),2008,40(4):115-120. 被引量:6
  • 5陈礼忠,陈钰晶,章志.节段预制、悬臂拼装工艺在工程中的综合运用[J].世界桥梁,2009,37(A01):59-63. 被引量:10
  • 6黄怡.苏通长江大桥TP75m/1200T架桥机结构总体设计[J].铁路建筑技术,2006(01):12一18.
  • 7AASHTO. Guide Specification for Design and Constructi- on of Segmental Concrete Bridge [ S ]. Washington D. C, 1999.
  • 8John Corven, Alan Morson. Post-Tensioning Tendon Insta- llation and Grouting Manuel [ M ]. Federal Highwa7 Ad- ministration, 2004, 5.

二级参考文献5

共引文献15

同被引文献49

引证文献8

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部