期刊文献+

基于Revit二次开发的电气设备族平台的搭建 被引量:23

Building Platform of Electrical Equipment Family based on BIM
在线阅读 下载PDF
导出
摘要 BIM技术中面向电气设计的应用研究相对较少,针对这种情况,以国内外广泛使用的Revit软件为基础,构建基于BIM的电气设备族平台。对电气设备参数化信息模型进行了研究,利用Revit API外部功能扩展方式,实现Revit对象的访问、过滤、编辑与创建,利用Family API实现电气设备族类型获取、族创建和族编辑,结合SQL Server,对Revit模型元素实现基于关系数据库的数据存储,该平台实现电气设备族统计、电气设备拖动和族属性导入。通过实际案例,验证平台的可行性与可靠性。 Electrical design oriented application research in BIM technology is relatively little,for this kind of situation,on the basis of Revit which is widely used at home and abroad,we built electrical equipment based on BIM platform. After studying parametric information model of electrical equipment,we used expansion method of Revit external API function and achieved the access of Revit objects,filtered,edited and created with Revit objects. We achieved the access of electrical equipment types,edited and created with Family API. Combined with SQL server,we realized Revit model elements data storage based on relational database. This platform can realise electrical equipment group,electrical equipment drag and importing family attributes. Through the actual case,the feasibility and reliability of the platform are verified.
出处 《土木建筑工程信息技术》 2015年第4期60-64,共5页 Journal of Information Technology in Civil Engineering and Architecture
关键词 BIM IFC标准 参数化 电气设备族 API BIM IFC standard Parametric Electrical Equipment Family API
  • 相关文献

参考文献7

二级参考文献28

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:109
  • 2Ma Z, Zhao Y. Model of next generation energy efficient design software for buildings [J]. Tsinghua Science and Technology, 2008, 13(S1) : 298 - 304.
  • 3Nour M, Performance of different (BIM/IFC) exchange formats within a private collaborative workspace for collaborative work [J]. Electronic Journal of Inforznation Technology in Construction, 2009(14) : 736 - 752.
  • 4VTT Building and Transport. Technical overview of IFC model server. (2010 09-15), http: //cic. vtt. fi/projects/ ifcsvr/lec/VTT TEC-ADA-11. pdf.
  • 5Kang H, l.ee G. Development of an object-relational IFC server [C]// Proceedings of the International Conference on Construction Engineering and Management/Project Management (ICCEM/ICCPM) 2009. Jeju, Korea: Korea Institute of Construction Engineering and Management Press, 2009: 1346-1351.
  • 6Ali M T, Ghassan A. Moving beyond the fourth dimension with an IFC-based single project database [J]. Automation in Cxmstruction, 2005, 14(1) : 15 - 32.
  • 7Faraj I, Alshawi M, Aouad G, et al. Industry foundation classes web-based collaborative construction computer environment: WISPER [J]. Automation in Construction, 2000, 10(10): 79-99.
  • 8Jeong J, Lee G, Kang H. Preliminary performance evaluation of an ORDB-based IFC server and an RDB-based IFC server by using the BUCKY benchmark method [C]// Proceedings of CIB World Congress 2010. Salford, UK: International Council for Building Press, 2010: 192 -201.
  • 9Ma Z M, Wang H. STEP implementation of imperfect EXPRESS model in fuzzy object-oriented databases [J]. Fuzzy Sets and Systems, 2006, 157(12): 1597-1621.
  • 10Karshenas S. Cost estimating in the age ol 3-13 UAIA sottware and obiect databases [C]// Proceedings of Construction Research Congress 2005: Broadening Perspectives. San Diego, USA: American Society of Civil Engineers Press, 2005:1233- 1240.

共引文献32

同被引文献212

引证文献23

二级引证文献191

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部