期刊文献+

基于全生命周期的高铁工程质量管理运营反馈机制研究 被引量:5

Research on Operation Feedback Mechanism to Project Quality Management of High Speed Railway Based on Full Life Cycle
在线阅读 下载PDF
导出
摘要 在高铁建设高速发展态势下,为强化建设与运营两大系统的对接协调,提高高铁工程质量管理水平,确保高铁安全运营,运用反馈论相关理论,探索在高铁工程质量管理中引入运营反馈机制,分析高铁工程质量管理运营反馈机制的内涵及组织模式,研究运营反馈机制在高铁工程设计、施工、验收和开通运营等全生命周期的实施方案。以西成客专陕西公司为例,通过分析运营反馈机制的实际运用过程及实践效果,发现运用运营反馈机制可有效整治设计、施工、静动态验收等各阶段发生的问题,夯实工程质量基础。最后,提出应强化运营反馈机制顶层设计、注重源头把控运营需求、统一各参建主体思想认识等建议,为全路范围内推广应用运营反馈机制提供思路。 This paper explores introduction of the operation feedback mechanism into project quality management of the high speed railway by applying relevant theories(for example,feedback theory),analyzes the connotation and organization mode of the mechanism and studies the implementation scheme of the mechanism in the full life cycle of the high speed railway,including engineering design,construction,acceptance and operation,so as to make better connection and coordination of the construction and operation systems,improve the level of project quality management of high speed railway and ensure the safe operation of high speed railway under its booming development.Taking Xi’an-Chengdu Railway Passenger Dedicated Line Shaanxi Co Ltd as an example,and by analyzing the practical application process and practice effect of the operation feedback mechanism,this paper finds out that the application of the mechanism can effectively overcome problems occurring in design,construction,and dynamic and static acceptance stages,and make the project quality more solid.Finally,this paper puts forward some suggestions,including identifying the top-level design of the operation feedback mechanism,focusing on the source to meet the operation requirements,and unifying the ideological understanding of main participants,which provides ideas for promotion and application of the operation feedback mechanism within the national railway system.
作者 葛新东 赵文秀 李子豪 GE Xindong;ZHAO Wenxiu;LI Zihao(Xi'an-Chengdu Railway Passenger Dedicated Line Shaanxi Co Ltd,Xi'an Shaanxi 710043,China;China Academy of Railway Sciences Corporation Limited,Beijing 100081,China)
出处 《中国铁路》 2020年第7期41-48,共8页 China Railway
基金 中国铁路总公司科技研究开发计划项目(2018F019)。
关键词 高速铁路 工程质量管理 运营反馈 全生命周期 high speed railway project quality management operation feedback full life cycle
作者简介 第一作者:葛新东(1968-),男,高级工程师。E-mail:313638013@qq.com;通信作者:赵文秀(1992-),女,研究实习员,硕士。E-mail:zhaowenxiu@rails.cn。
  • 相关文献

参考文献7

二级参考文献28

共引文献89

同被引文献34

引证文献5

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部