需求波动情况下千斤顶装配线的设计及应用 被引量:1

Design and Application of an Oil Jack Assembly Line in the Context of Demand Fluctuation
在线阅读 下载PDF
导出
摘要 制造业企业管理人员凭经验估算装配线产量,对合理产量缺乏量化分析,导致需求季节性波动情况下,企业不知如何设计装配线和调配劳动力,针对这类问题提出相应设计方案和合理化建议。首先,分析千斤顶装配线的生产流程,测定各工位的标准作业时间。在此基础上,对装配线进行平衡,计算出不同节拍装配线合理产量。最后,针对装配线柔性生产的要求,提出两种新方案,并计算新方案的日产量和平均劳动力利用率。研究结果不仅帮助管理人员解决了产量计算的问题,而且解决了需求季节性波动下装配线设计的难题。 In order to solve the problem of the production quantity calculation instead of the estimation by the management personnel?Aand solve the design problem of assembly lines under seasonal demand fluctuation,some design plans and advices were presented.The newly designed assembly line was balanced and labor force was allocated.First,the production process of an oil jack assembly line was analyzed,and the standard operation time of each station was measured.Next,the oil jack assembly line was balanced and the production quantity with different takt time was calculated.Then,two new design plans were put forward under the requirements of flexible production,and the daily production quantity and average labor utilization were given as well.The research not only helps managers to solve the problem of the production quantity calculation instead of the estimation by management experience,but also solve the problem of the design of assembly lines under seasonal demand fluctuations.
作者 吕文元 余海杰 刘勤明 LV Wenyuan;YU Haijie;LIU Qinming(Business School,University of Shanghai for Science and Technology,Shanghai 200093,China)
出处 《上海理工大学学报》 CAS 北大核心 2018年第4期358-363,共6页 Journal of University of Shanghai For Science and Technology
基金 国家自然科学基金资助项目(71471116) 上海市浦江人才计划资助项目(14PJC077) 上海市一流学科建设项目(S1201YLXK)
关键词 装配线 节拍 标准作业时间 平均劳动力利用率 assembly line takt time standard operation time average labor utilization
作者简介 第一作者:吕文元(1971-),男,教授.研究方向:设备维修管理.E-mail:wy_lu@sina.com
  • 相关文献

参考文献12

二级参考文献54

共引文献201

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部