以福平铁路北东口水道特大桥桩基钻孔平台为背景,介绍了深水裸岩区不同类型钻孔平台的施工方法,并对这些施工方法进行了对比分析,对强风浪地区深水裸岩钻孔平台施工具有参考价值。
Taking the pile foundation drilling platform of Beidongkou Waterways Grand Bridge in Fuping Railway as a background,this paper introduced several construction methods of drilling platform in deep water and uncovered rock area,and made a contrastive analysis of these construction methods. It could provide a reference value for drilling platform construction under the conditions of deep water,uncovered rock,strong winds and waves.