期刊文献+

三峡工程升船机上航道通航水流条件研究 被引量:2

Research on navigation conditions in upstream approach channel of TGP Ship lift
在线阅读 下载PDF
导出
摘要 三峡工程上游引航道实施全包隔流堤布置方案后,升船机上游引航道的通航设施布置也因水流条件变化需作相应调整。通过水力学试验及自航船模试验对上游引航道隔流堤、浮堤及浮趸船的布置进行了研究,并据此推荐了隔流堤堤顶高程150m、浮堤长120m的经济合理的布置方案。 After a dopting a wholly enclosed dividing?dike scheme in the upstream approach area of TGP, the navigation installations in upstream approach channel of TGP ship lift must be readjusted correspondingly. a study on different arrangements of dividing dike, floating dike and floating pontoon were performed and compared each other by hydraulics tests and remote controlled ship model tests, and an economic and rational scheme in which the elevation of top of the dividing dike is 150 m and the length of the floating dike 120 m is recommended.
作者 朱红兵 陈辉
出处 《长江科学院院报》 CSCD 北大核心 2003年第5期8-11,共4页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程 升船机上航道 通航设施 水流 水力学 试验 隔流堤 浮堤 Three Gorges Project(TGP) upstream navigation channel of ship lift navigation installation optimization
  • 相关文献

参考文献4

  • 1李发政 杨伟 蔡莹.三峡工程通航建筑物上游引航道全包方案水工模型试验报告[R].武汉:长江科学院,2001..
  • 2史德亮 杨伟.三峡工程升船机上航道通航设施布置水工模型试验报告[R].武汉:长江科学院,2001..
  • 3史德亮 杨伟.三峡工程升船机上航道通航设施布置水工模型试验报告[R].武汉:长江科学院,2001..
  • 4李发政 杨伟 蔡莹.三峡工程通航建筑物上游引航道全包方案水工模型试验报告[R].武汉:长江科学院,2001..

同被引文献16

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部