摘要
上海地铁车站综合防水方案是以钢筋混凝土结构自防水为基础与设置诱导缝、施工缝、变形缝、预埋件防水和做好附加防水层相结合;实行设计、建设、施工、材料与保证工程质量相结合;重视车站钢筋混凝土结构防水施工质量与重视基坑工程安全稳定及结构裂缝、弊病的堵漏处理相结合;实行防水工程质量的全员管理和全过程管理相结合,使综合防水工程质量得到保证。
The comprehensive waterproof program in Shanghai subway stations is based on reinforced concrete self-waterproof in combination with waterproof of induced joints, construction joints, movement joints, embedded parts and additional waterproof layer. It is carried out combine the design, build, construction, materials with project quality assurance. Attention is paid to the waterproof performance of reinforced concrete structure in the stations. Attention is also paid to the combination of safety and stability of foundation pits with the treatment of structure crack and caulking of leakage. It is carried out that the overall staff management of waterproof quality in combination with science and research, design, construction, and supervision is integraled with the overall process management to ensure the comprehensive waterproof quality.
出处
《建筑技术》
北大核心
2003年第7期490-493,共4页
Architecture Technology