基于BIM技术的建筑施工进度管理优化方法

Optimization Method for Construction Schedule Management Based on BIM Technology
在线阅读 下载PDF
导出
摘要 文章主要探讨了基于BIM技术的建筑施工进度管理优化方法,通过构建BIM信息模型平台,应用4D施工管理模型,结合可视化图纸,以实现施工进度的实时跟踪与调整。结果显示,BIM技术的应用将进度偏差率控制在±5%以内,有效提升了施工效率与质量控制水平,显著提高了施工进度管理效果,减少工期延误,为建筑施工行业智能化发展提供了有力支持。 The article mainly discusses the optimization method of construction schedule management based on BIM technology.By building a BIM information modeling platform and applying a 4D construction management model,combined with visual drawings,real-time tracking and adjustment of construction progress can be achieved.The results show that the application of BIM technology controls the progress deviation rate within±5%,effectively improves construction efficiency and quality control level,significantly enhances construction progress management effectiveness,reduces project delays,and provides strong support for the intelligent development of the construction industry.
作者 高嵩 GAO Song(Jinan Xianxian Investment Group Co.,Ltd.,Jinan 250000,China)
出处 《中国厨卫》 2025年第8期57-59,共3页 Chinese Kitchen & Bathroom
关键词 BIM技术 建筑施工 进度管理 BIM technology construction of buildings progress management
作者简介 高嵩(1987-),本科,研究方向为建筑工程。
  • 相关文献

参考文献8

二级参考文献64

共引文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部