施工期边坡挂渣诱发泥石流的综合防治体系研究

Study on comprehensive prevention and control systemfor debris flow induced by slope slag accumulation during engineering construction period
在线阅读 下载PDF
导出
摘要 山区工程建设会扰动周边环境的生态平衡,导致当地泥石流灾害频发。边坡挂渣诱发泥石流具有“小规模、短时突发”的显著特点,其在施工期的防护重点是对临建设施的短时防护。首先分一般情况和存在淤堵-溃决反应两种情况对边坡挂渣诱发泥石流的致灾机理进行系统剖析,讨论了现有泥石流防治措施对于临建设施短时防护的适用性,并结合施工期现有资源条件,综合利用不同工程手段的互补特性,采用分阶段治理原则,设计了一套以“消能、拦渣、沉沙、溢流、导排、固基”为显著特色的综合防治体系。分析表明:该综合防治体系以就地取材为显著特点,可在较低建设运行成本投入条件下实现短时防护目标。相关经验可供工程建设方参考。 Engineering construction in mountainous areas disrupts the ecological balance of the surrounding environment,often triggering localized debris flow disasters.Debris flows induced by slope slag accumulation exhibit distinct characteristics of small scale and short-term suddenness,necessitating short-term protection measures for temporary facilities during construction.This study systematically analyzes the disaster-causing mechanisms of such debris flows,based on normal condition and congestion-breaking condition.The applicability of existing debris flow prevention measures for short-term protection is evaluated.Using available resources during construction and integrating the complementary advantages of various engineering methods,a comprehensive prevention and control system is designed based on phased treatment principles,which incorporates energy dissipation,slag retention,sediment deposition,overflow drainage,and foundation stabilization to achieve effective short-term protection with low construction and operational costs.The proposed framework provides practical insights for construction teams in similar scenarios.
作者 王友乐 缪正建 曹克磊 梅慧 蒋骞 白林 WANG Youle;MIAO Zhengjian;CAO Kelei;MEI Hui;JIANG Qian;BAI Lin(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China;State Key Laboratory of Water Resources Engineering and Management,Wuhan 430072,China;EPC Management Technology Center,Wuhan 430010,China;School of Water Conservancy,North China University of Water Resources and Electric Power,Zhengzhou 450046,China;Central Yunnan Provincial Water Diversion Project Co.,Ltd.,Kunming 650051,China)
出处 《人民长江》 北大核心 2025年第6期138-143,共6页 Yangtze River
基金 长江勘测规划设计研究有限责任公司自主创新项目(CX2021Z56,CX2023S024) 国家自然科学基金项目(52309169)。
关键词 边坡挂渣 泥石流 综合防治体系 施工期 短时防护 slope slag accumulation debris flow comprehensive prevention and control system construction period short-term protection
作者简介 王友乐,男,工程师,博士,主要从事智能碾压与施工质量控制、寒区筑坝与混凝土温控方面的研究。E-mail:wyl98517@tju.edu.cn;通信作者:曹克磊,男,讲师,博士,主要从事水工结构性能安全与可靠性分析方面的研究。E-mail:keleic@126.com。