摘要 结合广州市十涌西路顶管工程设计、施工案例,介绍市政排水工程顶管顶进施工工艺原理和关键技术点,包括顶进工艺原理、针对不同土质条件顶进施工的要点、顶管顶进过程中的测量技术、顶管顶进过程中的纠偏方法以及控制要点,并通过工程实际得出监测结果:地表沉降最大累计量仅为6.5 mm,地表沉降最大速率1.2 mm/d,验证了在复杂的地质条件下,采取相应的措施并严格执行测量纠偏技术,能够适应地质变化,确保顶管施工的安全性和可靠性。 Combining the design and construction case of the Guangzhou Shiyongxi Road Pipe Jacking Project,the principle and key technical points of the municipal drainage engineering pipe jacking construction process were introduced,including the principle of the jacking process,the essentials of jacking construction under different soil conditions,measurement techniques during the pipe jacking process,correction methods during the pipe jacking process,and control points.The monitoring results from the actual project indicate that the maximum cumulative surface settlement is only 6.5 mm,with a maximum rate of surface settlement at 1.2 mm/d.This verifies that by adopting corresponding measures and strictly implementing measurement and correction techniques,it is possible to adapt to geological changes,ensuring the safety and reliability of pipe jacking construction under complex geological conditions.
作者 钱泽顼 李亚 罗利 QIAN Zexu;LI Ya;LUO Li(Guangdong Architectural Design&Research Institute Co.Ltd.,Guangzhou 510000,China;China MCC5 Group Corp.Ltd.,Chengdu 610063,China)
出处 《科技和产业》 2025年第2期263-268,共6页 Science Technology and Industry
基金 中国中冶重大研发项目(中冶科技[2023]5号-5)。
关键词 市政排水工程 顶管工程 顶进工艺原理 顶进测量 顶进纠偏 municipal drainage engineering pipe jacking project jacking process principle jacking measurement jacking correction
作者简介 钱泽顼(1990-),男,陕西渭南人,工程师,研究方向为市政工程设计施工;李亚(1990-),女,重庆人,工程师,研究方向为市政与公路工程施工技术与管理;通信作者:罗利(1978-),男,四川宜宾人,正高级工程师,研究方向为市政工程施工技术。
  • 相关文献

参考文献14

二级参考文献102

共引文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部