摘要
管线下穿动载道路等敏感区域时,易引起周围土体变形,造成土体周边沉降与隆起。为解决传统顶管技术的不足,更好地实现复杂环境下顶管安全穿越城市道路等敏感区域,以什邡市城东片区配套道路排水工程顶管施工为背景,研究一种地下排水管线顶管穿越动载路面的施工方法。该方法包含顶进、掘进、线型控制及灌浆系统,通过顶进前的数值模拟与安全评估,优化顶进工艺。工程实践表明,顶管结束以后,管道区域顶部路基及路面变形较小,满足施工变形控制的要求。
When the pipeline passes through sensitive areas such as dynamic load roads,it is easy to cause surrounding soil deformation,resulting in settlement and uplift around the soil.In order to solve the shortcomings of traditional pipe jacking technology and better realize the safe pipe jacking through sensitive areas such as urban roads in complex environments,taking the pipe jacking construction of supporting road drainage projects in the east of Shifang City as the background,a construction method of underground drainage pipeline jacking through dynamic load pavement is studied.The method includes jacking,tunneling,linear control and grouting system.Through numerical simulation and safety assessment before jacking,the jacking process is optimized.Engineering practice shows that after pipe jacking,the deformation of subgrade and pavement at the top of the pipeline area is small,which meets the requirements of construction deformation control.
作者
罗利
刘卫华
童龙伟
付华永
LUO Li;LIU Weihua;TONG Longwei;FU Huayong(China MCC5 Group Corp.Ltd.,Chengdu 610063,China)
出处
《科技和产业》
2024年第13期265-270,共6页
Science Technology and Industry
基金
中国中冶重大研发项目(中冶科技〔2023〕5号-5)。
关键词
排水管道
顶管施工
安全评估
激光测量
注浆预加固
drainage pipe
pipe jacking construction
safety assessment
laser measurement
pre-reinforcement by grouting
作者简介
罗利(1978-),男,四川宜宾人,正高级工程师,研究方向为市政与公路工程技术;刘卫华(1979-),男,湖南洞口人,博士,正高级工程师,研究方向为隧道与地下工程;童龙伟(1977-),男,四川名山人,高级工程师,研究方向为市政与公路工程技术;付华永(1986-),男,河南驻马店人,高级工程师,研究方向为市政与公路工程技术。