摘要
工程算量是工程项目管理的基础,传统工程算量方式容易出现漏算、误算、重复算等问题,工作效率低、准确率低,导致工程项目管理困难。基于国产化图形引擎技术的过程算量方法,为项目基层人员算量提供了快速算量方法,通过该方法定义构件类并批量生成类实例对象快速生成BIM模型、快速精确算量,自动生成工程数量表、材料数量表、清单数量表等,为项目基层人员减负增效。
Engineering quantity calculation forms the foundation of project management.Traditional methods often encounter issues such as omissions,miscalculations,and repetitions,leading to low efficiency and accuracy,which complicates project management.The process quantity calculation technique based on domestic graphics engine technique provides an efficient approach for project personnel.By defining component classes and generating class instance objects in batches,BIM models can be created rapidly,enabling quick and accurate quantity calculation and the automatic generation of engineering quantity tables,material quantity tables,and bill quantity tables,thereby reducing the workload and improving efficiency for project personnel.
作者
王步云
李上寿
WANG Buyun;LI Shangshou(Anhui Shuzhi Construction Research Institute Co.,Ltd.,Hefei 230022,Anhui,China;China Railway No.4 Engneering Group Co.,Ltd.,Hefei 230022,Anhui,China)
出处
《建筑施工》
2024年第12期2025-2028,共4页
Building Construction
关键词
工程算量
动态算量
图形技术
构件实例化
建筑三维信息模型
engineering quantity calculation
dynamic quantity calculation
graphic technique
component instantiation
3D building information model
作者简介
王步云(1990-),男,高级工程师,5632012229@qq.com。