期刊文献+

基于BIM的多阶段成本控制在工程造价管理中的应用

Application of Multi-Stage Cost Control Based on BIM in Engineering Cost Management
在线阅读 下载PDF
导出
摘要 通过对比传统静态成本控制、BIM动态控制、多阶段控制模型和基于BIM的多阶段动态成本控制四种方法,分析了不同成本控制技术在大型工程项目中的应用。研究表明:基于BIM的多阶段动态成本控制方法在成本节约、投资回报率(ROI)、质量和风险管理方面均表现出显著优势。 This paper provides an in-depth analysis of the performance of various cost control techniques in large-scale engineering projects by comparing four methods:traditional static cost control,BIM-based dynamic control,multi-stage control model,and BIMbased multi-stage dynamic cost control.The study reveals that the BIM-based multi-stage dynamic cost control method demonstrates significant advantages in cost savings,return on investment (ROI),and quality and risk management.
作者 张晋峰 连勇 ZHANG Jin-feng;LIAN Yong(Shanxi Fifth Construction Group Co.,LTD,Taiyuan,Shanxi,030000,China;Shanxi Vocational University of Engineering Science and Technology,Jinzhong,Shanxi,030619,China)
出处 《建材技术与应用》 2024年第6期71-76,共6页 Research and Application of Building Materials
基金 山西工程科技职业大学横向课题(HSLB-2023-1804-0011)。
关键词 BIM技术 多阶段动态成本控制 项目管理 投资回报率 成本控制 工程造价 BIM technology multi-stage dynamic cost control project management return on investment(ROI) cost control engineering cost
作者简介 张晋峰(1989-),男,山西太原人,工程师,现从事项目管理方面的工作。
  • 相关文献

参考文献8

二级参考文献32

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部