期刊文献+

斜沟煤矿3号煤层覆岩结构综放开采顶板涌水量预测研究 被引量:1

Research on roof water inflow prediction of overburden structure fully mechanized caving in No.3 coal seam of Xiagou Coal Mine
在线阅读 下载PDF
导出
摘要 覆岩结构综放开采顶板渗水现象仍然为煤矿生产主要制约因素之一。以斜沟煤矿3号煤层为主要研究对象,通过对覆岩结构综放开采裂隙分布规律研究以及覆岩结构综放开采涌水量数值分析,实现对覆岩结构综放开采顶板涌水量的预测,以期对矿井水害防治研究有所帮助。 The seepage phenomenon of roof in fully mechanized caving mining with overlying rock structure is still one of the main restricting factors in coal mine production.Taking the No.3 coal seam of Xuegou Coal Mine as the main research object,through the research on the crack distribution law of fully mechanized caving mining with overburden structure and the numerical analysis of the water inflow in the fully mechanized caving mining with overburden structure,the prediction of the water inflow in the roof of fully mechanized caving mining with overburden structure is realized,which is expected to be of some help to the research of mine water disaster prevention and control.
作者 王君卿 WANG Junqing(Xiagou Coal Mine,Shanxi Xishan Jinxing Energy Co.,Ltd.,Lvliang033602,China)
出处 《煤矿现代化》 2022年第1期88-90,共3页 Coal Mine Modernization
关键词 覆岩结构综放开采 涌水量预测 数值模拟 fully mechanized caving mining of overlying rock structure water inflow prediction numerical simulation
作者简介 王君卿(1988-),男,2021年毕业于中国矿业大学,现就职于山西西山晋兴能源有限责任公司斜沟煤矿从事矿山水文地质研究工作,助理工程师。
  • 相关文献

参考文献4

二级参考文献40

共引文献29

同被引文献12

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部