期刊文献+

综采工作面顶板破碎机理及控制技术 被引量:4

Roof crushing mechanism and control technology in fully mechanized mining face
在线阅读 下载PDF
导出
摘要 针对5308工作面回采至470 m处工作面45#~67#支架前方顶板破碎、煤壁片帮现象,导致工作面回采速度慢、支架移架困难、支架工作阻力不足等,严重制约着工作面安全高效回采;本文合理分析了工作面顶板破碎机理,并根据实际生产情况,对工作面顶板及煤壁提出了注浆加固技术,通过实际应用效果来看,取得了显著应用成效。 In view of the phenomenon that the roof in front of the working face 45#~67#support is broken and the coal wall is sliced from 5308 working face to 470 m,which leads to slow mining speed,difficult support moving and insufficient support working resistance,which seriously restricts the safe and efficient mining of the working face.This paper reasonably analyzes the roof crushing mechanism of the working face,and puts forward the grouting reinforcement technology for the roof and coal wall of the working face according to the actual production situation.Through the practical application effect,remarkable application effect has been achieved.
作者 张骏立 ZHANG Junli(Shanxi Changping Coal Industry Co.,Ltd.,Jincheng Shanxi 048000,China)
出处 《山西化工》 2021年第4期104-105,108,共3页 Shanxi Chemical Industry
关键词 综采工作面 顶板破碎 破碎机理 注浆加固 应用分析 fully mechanized face roof crushing crushing mechanism grouting reinforcement application analysis
作者简介 张骏立,男,1990年出生,毕业于太原科技大学,本科,助理工程师,从事煤矿安全生产管理工作。
  • 相关文献

参考文献5

二级参考文献12

共引文献16

同被引文献11

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部