期刊文献+

巴基斯坦某滨海风电场关键问题探讨 被引量:1

Discussion on Key Issues of a Coastal Wind Farm in Pakistan
在线阅读 下载PDF
导出
摘要 巴基斯坦某滨海风电场是"一带一路"示范项目——中巴经济走廊建设计划中的优先发展项目。根据该风电场实际案例,阐述在项目设计、接入系统报审、施工等方面遇到的关键问题并给出解决方法。通过该典型案例,可以全面了解巴基斯坦风电实施过程中的重点难点问题,若在建设前能充分掌控这些难点问题,则可降低建设难度,加快项目进程,提高施工质量,确保项目顺利实施和按期投产。 The coastal wind farm in Pakistan is a priority project in the "One Belt and One Road" demonstration project - the construction planning of the China-Pakistan Economic Corridor. According to the practical case of the wind farm, the key problems encountered in project design, access system review and construction, etc. are elaborated and solutions are proposed. Through this typical case, we can fully understand the key and difficult problems in the implementation of wind farm in Pakistan. If all these key problems are controlled before construction, it is possible to reduce the construction difficulty, speed up the project progress, improve the construction quality, and ensure the smooth implementation and operation of the project on schedule.
作者 牛子曦 王旭英 刘蔚 NIU Zixi;WANG Xuying;LIU Wei(PowerChina Northwest Engineering Corporation Limited,Xi'an 710065,China)
出处 《西北水电》 2019年第1期6-9,共4页 Northwest Hydropower
关键词 巴基斯坦 滨海风电场 接入系统报审 设计标准 极端风况 海洋水文 Pakistan coastal wind farm access system review design criteria extreme wind conditions marine hydrology
作者简介 牛子曦(1973-),男,西安市人,高级工程师,主要从事风光资源设计工作.
  • 相关文献

参考文献11

二级参考文献73

共引文献65

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部