城市轨道交通PPP项目运营阶段风险识别 被引量:18

Risk Identification of Urban Rail Transit PPP Projects during Operation Period
在线阅读 下载PDF
导出
摘要 将财务风险预警理论引入可行性缺口模型,计算财务数据对轨道交通PPP项目可行性缺口补助的敏感性系数,以此来识别城市轨道交通项目运营期风险控制的主要对象。通过对青岛地铁4号线PPP项目的实例分析,验证该方法的可行性和科学性,并根据风险分担原则确定风险分担机制。 This paper introduces the financial risk early warning theory into the viability gap funding model,and calculates the sensitivity coefficient of the financial data to the viability gap funding of urban rail transit PPP project to identify the main target of the risk control of the urban rail transit project during the operation period. Based on the analysis of the PPP project of Qingdao metro line 4,verifies the feasible and scientific aspect of the method,and determines the risk sharing mechanism according to the risk sharing principle.
作者 王凯妮 邓小鹏 赵超 WANG Kaini;DENG Xiaopeng;ZHAO Chao(School of Civil Engineering,Southeast University,Nanjing 211189,China)
出处 《建筑经济》 北大核心 2019年第2期36-39,共4页 Construction Economy
基金 国家自然科学基金项目"国际高铁项目瞬时竞争优势的形成机理 动态度量及提升路径研究"(71771052)
关键词 城市轨道交通 PPP项目 运营风险 可行性缺口补助 urban rail transit PPP project operational risk viability gap funding
作者简介 王凯妮,女,生于1995年,江苏宿迁人,硕士研究生,研究方向:PPP项目风险,高铁竞争优势;邓小鹏,男,生于1972年,湖北随州人,副教授,研究方向:项目管理、可持续建设、房地产及住房保障。