期刊文献+

成都城市音乐厅基岩区域富水深基坑综合降排水技术 被引量:1

Comprehensive Dewatering and Drainage Technology of Deep Foundation Excavation in Bedrock Area of Chengdu City Concert Hall
在线阅读 下载PDF
导出
摘要 采用基岩区域富水深基坑综合降排水技术,综合考虑、合理布置护壁截水沟、护壁排水沟、基底引水盲沟和坑内临时集水坑等降排水措施,可解决基岩区域富水深基坑中地下水大量涌入的难题,能够有效保证施工进度、质量与安全,具有良好的社会效益。 The problem of groundwater inflowing into deep foundation excavation with abundant water in bedrock area can be solved by adopting comprehensive dewatering and drainage technology, on the base of comprehensive consideration and reasonable arrangement of wall protection catchwater ditches, wall protection drainage ditches, base blind ditches and temporary water storage ditches. The construction process quality and safety can be guaranteed, which have good social benefits.
作者 任志平 施圣贤 张今虎 彭伟 张韬 REN Zhiping;SHI Shengxian;ZHANG Jinhu;PENG Wei;ZHANG Tao(Chengdu Branch of China Construction Third Engineering Bureau Co.,Ltd.,Chengdu,Sichuan 610041,China)
出处 《施工技术》 CAS 2018年第20期85-89,共5页 Construction Technology
关键词 深基坑 盲沟 降水 排水 施工技术 deep foundation excavation blind ditch dewatering drainage construction
作者简介 任志平,高级工程师,E-mail:259359959@qq.com
  • 相关文献

参考文献5

二级参考文献21

共引文献25

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部