期刊文献+

“华龙一号”核反应堆堆芯板的制造

Manufacture of Hualong No.1 Nuclear Reactor Core Board
在线阅读 下载PDF
导出
摘要 "华龙一号"核反应堆堆芯板位于压力容器的吊篮筒体中,与燃料组件定位销组装后用于定位反应堆燃料组件,并在核反应堆运行时限制燃料组件位移。介绍了堆芯板的技术要求与材料特性,论述了堆芯板的制造流程,分析了制造难点与应对措施。 The Hualong No.1 nuclear reactor core plate is located in the core barrel of the pressure vessel and is assembled with the locating pin of fuel assembly to position the reactor fuel assembly and limit the displacement of the fuel assembly during operation of the nuclear reactor. The technical requirements and material properties of the core board were introduced. The manufacturing process of the core board was discussed, and the manufacturing difficulties and countermeasures were analyzed.
出处 《装备机械》 2018年第3期22-25,38,共5页 The Magazine on Equipment Machinery
关键词 核反应堆 堆芯板 制造 Nuclear Reactor Core Board Manufacture
作者简介 辛正高(1982-),男,本科,工程师,主要从事堆内构件设计制造工作
  • 相关文献

参考文献6

二级参考文献38

共引文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部