摘要
利用BIM技术成功解决了在建筑物体混凝土结构向钢结构转换处转换层梁柱节点的钢筋排布和下料优化问题。通过BIM软件建立的节点三维模型,对节点进行二次深化设计,并将设计结果进行可视化交底。此技术缩短了节点深化的时间,简化了技术交底流程,保证了节点施工质量,节约了钢筋等原材料,减少了节点施工工期。
In the transition from the concrete structure to the steel structure,the BIM technology has successfully solved the problems with the steel bar arrangement of transition layer beam-column joints and the optimization of leftover material.BIM can be employed to establish a three-dimensional node model,improve the secondary design of nodes and visualize the results of designs.This technology can shorten the time for deepening the nodes,simplify the technical clarification process,ensure the construction quality of nodes,save steel and other raw materials,and decrease the node construction period.
作者
李嘉宁
LI Jia-ning(The Third Construction Engineering Company, L td . ,China Construction Second Engineering Bureau Co. L td . ,Beijing 100070, Chin)
出处
《唐山学院学报》
2018年第3期66-69,73,共5页
Journal of Tangshan University
关键词
劲性结构节点
BIM技术
深化设计
reinforced structure node
BIM technology
secondary design
作者简介
李嘉宁(1990-),男,河北唐山人,助理工程师,主要从事BIM研究.