急倾斜厚大矿体空场嗣后充填法矿房结构参数计算 被引量:4

Structural Parameters Calculation of Large and Thick Steeply Inclined Orebody with Open Stope Filling Method Later
在线阅读 下载PDF
导出
摘要 针对大结构矿房空场嗣后分步充填开采急倾斜厚大矿体的安全性问题,将分步式矿房结构近似为连跨超静定三铰拱和单位面积长细压杆,并根据附加力、结构形变等因素作用,利用极限平衡理论和摩尔库伦准则,推导出矿房宽度b和跨度l的关系式以及阶段高度hcr的临界计算式。以田兴铁矿为例,利用模型得出阶段高度为50 m,一步胶结充填矿房取20 m宽,二步尾砂充填矿房在第一类和第二类矿柱位置处取16 m宽,在第三类矿柱矿房位置处取24 m宽,可保证井下安全生产。 In view of the security of steeply-inclined thick orebody with large structure room and open stope subsequent filling,the step by step room structure is approximately regarded as the multi-span statically indeterminate three hinged arch and long thin pressure bar per unit. According to the additional force,structure deformation and other factors,the limit equilib-rium theory and Moore Kulun criterion are used to deduce the relation formula of the stope width b and l span,and the critical calculating formula of level height hcr. Taking Tianxing Iron Mine for example,the conclusion was drawn as the mining level height being 50 m,the width of one-step cemented backfilling room being 20 m,the width of the first and the second ore pillar at two-step tailing backfilling room being 16 m,and the width of the third pillar 24 m. All that could guarantee the safety of un-derground production.
出处 《金属矿山》 CAS 北大核心 2017年第12期6-9,共4页 Metal Mine
基金 国家重点研发计划项目(编号:2016YFC0801601)
关键词 急倾斜厚大矿体 分步充填 超静定三铰拱 压杆稳定性 结构参数 Steeply-inclined thick ore-body Multi-step backfilling Statically indeterminate three hinged arch Stability of pressure bar Structural parameters
作者简介 翟会超(1981-),男,高级工程师,博士后。
  • 相关文献

参考文献3

二级参考文献25

  • 1Mustafa Kumral.Multi-period mine planning with multi-process routes[J].International Journal of Mining Science and Technology,2013,23(3):317-321. 被引量:7
  • 2李一帆,张建明,邓飞,白世伟.深部采空区尾砂胶结充填体强度特性试验研究[J].岩土力学,2005,26(6):865-868. 被引量:140
  • 3何满潮,谢和平,彭苏萍,姜耀东.深部开采岩体力学研究[J].岩石力学与工程学报,2005,24(16):2803-2813. 被引量:2125
  • 4Brady B.H.G,Brown E.T.(著).余诗刚,朱万成,赵文等(译).地下采矿岩石力学[M],北京:科学出版社,2011.
  • 5BROWN E T. Analytical and computational methods in engineering rock mechanics[M]. London: Allen and Unwin, 1987.
  • 6Jin A B, Yuwen, Z P. A subsidence numerical describing iron ore mining goaf and it [ C ]//International Symposium model to s related on Project Management. Wuhan,2010 : 36 - 40.
  • 7Zhu D Y,Zhang D B. Goal treatment for gold mine under expressway I C]//3rd International Institute of Statistics and Management Engineering Symposium. Weihai, 2010 : 151 - 155.
  • 8Rodriguez R, Torano J, Menendez M. Prediction of the airblast wave effects near a tunnel advanced by drilling and blasting I J ]. Tunnelling Underground Space Technology, 2007.22:241 - 251.
  • 9Swift G M,Reddish D J. Stability problems associated with an abandoned ironstone mine [ J ]. Bulletin of Engineering Geology and the Environment,2002,61 (3) :227 -239.
  • 10Nomikos P P, Sofianos A I, Tsoutrelis C E. Structural response of vertically multi-jointed roof rock beams [ J ]. International Journal of Rock Mechanics & Mining Sciences, 2002,39( 1 ) :79 -94.

共引文献43

同被引文献49

引证文献4

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部