期刊文献+

层状围岩对隧洞爆破开挖时超欠挖的影响

Stratified Surrounding Rock Have an Influence on Overbreak and Underbreak of Tunnels when Blasting Excavation
在线阅读 下载PDF
导出
摘要 层状围岩是经常遇见的一种地质条件,对隧洞爆破施工有很不利的影响。通过对新疆克州布伦口-公格尔水电站引水发电洞进行数值模拟分析,得出层状围岩在爆破开挖时的一些特点,找出容易超欠挖的部位,对超欠挖给出具体建议,为今后设计、施工提供参考和借鉴。 Stratified surrounding rock is one of geological conditions in usual and there are adverse effects on the tunnel Blasting.By using numerical simulation to analysis the stratified surrounding rock of Bulunkou -Konggur hydropower station ,find some features about the stratified surrounding rock when blasting excavation and the easily destroyed location.Give some specific suggestions about over-break and underbreak and provide reference for future design and construction.
作者 王鹏
出处 《水利科技与经济》 2014年第8期125-127,共3页 Water Conservancy Science and Technology and Economy
关键词 层状围岩 超欠挖 数值模拟 爆破开挖 stratified surrounding rock overbreak and underbreak numerical simulation blasting excavation
作者简介 王鹏(1987-),男,新疆乌鲁木齐人,硕士研究生,从事水利水电工程设计工作.
  • 相关文献

参考文献7

二级参考文献14

共引文献141

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部