摘要 西龙池抽水蓄能电站引水斜井长756.59m,倾角56°或60,°是大坡度超长斜井。斜井开挖采用阿里玛克爬罐自下而上打导井和反井钻自上而下打导孔再反拉导井技术,并设施工支洞。施工中针对导洞位置选择、扩挖掌子面设计、钻机定位、测量工艺、贯通精度、爆破方式等,采取了一系列的技术措施,安全优质地完成了斜井施工。 The inclined shaft with a length of 756.59 meters and an angle of 56 or 60 degrees in Xilongehi Pumpedstorage Power Station is the one with high-gradient and over-length. During the construction, Alimak Raising Climber is used as a operating platform to excavate the shaft from bottom to top; and on the other working surface, the Rotary Drilling Machine is used to drill pilot hole from top to bottom and then expand the hole from bottom to top. There are 4 adits along the working site and a series of technical measures have been taken for location selection of pilot shaft, heading face design, drill position, breakthrough accuracy, survey technology and blasting method, in this way, the excavation of inclined shaft has been Completed Safely in high quality.
作者 姬脉兴
出处 《水力发电》 北大核心 2006年第12期36-38,共3页 Water Power
关键词 斜井开挖 施工技术 西龙池抽水蓄能电站 excavation of inclined shaft construction technology Xilongchi Pumped-storage Power Station
作者简介 姬脉兴(1951-),男,河南睢县人.教授级高工,中国水利水电第三工程局副总工程师,主要从事水利水电工程施工技术管理工作.
  • 相关文献

同被引文献64

引证文献11

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部