摘要
山东东平体育会展中心屋面为直立锁边A1-Mg-Mn双曲异形金属屋面,屋面与玻璃幕墙用GRC屋面挑檐过渡衔接,屋面上设置有排烟采光顶。工程通过设计图纸与现场照片对比的方式,来剖析设计与施工过程中遇到的技术问题,并已取得成功。
The roof of Shandong Dongping Sports and Exhibition Center is a standing seam A1-Mg-Mn hyperbolical metal roof with special shapes, and GRC cornices were used for the transition and joining between roof and glass curtain, and smoke discharging skylights are available on the roof. The technical problems met during the design and construction period were analyzed by comparing the design drawings and site pictures, and were solved successfully.
出处
《中国建筑防水》
2014年第19期15-23,共9页
China Building Waterproofing
关键词
金属屋面
双曲屋面
GRC挑檐
排烟采光顶
设计
施工
metal roof, hyperbolical roof
GRC cornice
smoking discharging skylight
design
constrnclion
作者简介
王宝平,男,1972年生,高级工程师,秦皇岛市中贤幕墙装饰工程有限公司总工程师。联系地址:066004河北省秦皇岛市经济技术开发区龙海道80号,E-mail:baopingw@sina.com,。