摘要
江苏溧阳抽水蓄能电站地下厂房所处围岩较差,工程地质条件错综复杂,厂区断层发育密度大,施工安全问题极为突出。溧阳地下厂房采用顶拱开挖与支护的施工方法。通过实践证明该施工方法能保证在复杂地质条件下,大跨度地下厂房顶拱开挖与支护的施工安全、质量和进度。
The surrounding rock and the engineering geological conditions where the underground powerhouse of Liyang Pumped Storage Power Plant is located are poor and complicated. The faults in the plant area are developed largely in term of intensity. Its construction safety is serious accordingly. The underground powerhouse crown of the power plant is supported while excavated. The engineering practice proves that this construction method can assure the safety, quality and progress of the excavation and support of the large-span underground powerhouse crown under the complicated geological conditions.
出处
《西北水电》
2014年第3期36-39,共4页
Northwest Hydropower
关键词
地下厂房
开挖
支护
溧阳抽水蓄能电站
underground powerhouse
excavation
support
Liyang Pumped Storage Power Plant
作者简介
高雄(1974-),男,陕西省延川县人,高级工程师,主要从事水利水电工程施工管理.