摘要 江苏溧阳抽水蓄能电站地下厂房所处围岩较差,工程地质条件错综复杂,厂区断层发育密度大,施工安全问题极为突出。溧阳地下厂房采用顶拱开挖与支护的施工方法。通过实践证明该施工方法能保证在复杂地质条件下,大跨度地下厂房顶拱开挖与支护的施工安全、质量和进度。 The surrounding rock and the engineering geological conditions where the underground powerhouse of Liyang Pumped Storage Power Plant is located are poor and complicated. The faults in the plant area are developed largely in term of intensity. Its construction safety is serious accordingly. The underground powerhouse crown of the power plant is supported while excavated. The engineering practice proves that this construction method can assure the safety, quality and progress of the excavation and support of the large-span underground powerhouse crown under the complicated geological conditions.
出处 《西北水电》 2014年第3期36-39,共4页 Northwest Hydropower
关键词 地下厂房 开挖 支护 溧阳抽水蓄能电站 underground powerhouse excavation support Liyang Pumped Storage Power Plant
作者简介 高雄(1974-),男,陕西省延川县人,高级工程师,主要从事水利水电工程施工管理.
  • 相关文献

参考文献7

二级参考文献17

共引文献11

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部