向家坝水电站右岸地下厂房规模大,洞室密集,开挖工程量巨大。针对其开挖施工方案,着重分析了其难点和重点以及特殊情况,提出了相应的处理对策。
The lager scale underground powerhouse and intensive caverns are located in the right bank of Xiajiaba power station and the excavation is a huge amount works.According to the excavation plan,the paper analyzes emphatically its emphasis,difficulty and special circumstances and puts forward the corresponding treatment measures.