基于神经网络评价的郑徐高铁建设质量风险研究 被引量:1

Quality Risk Research on Zheng-Xu High-speed Railway Construction Based on Neural Network Evaluation
在线阅读 下载PDF
导出
摘要 通过使用专家模糊评判与BP神经网络相结合评价方法对郑徐高铁建设项目质量风险进行研究。首先建立项目质量风险评价指标体系,然后采用专家模糊评判法对郑徐高铁建设项目质量风险因素的风险等级进行评估,获取评价数据,接着运用已建好的BP神经网对郑徐高铁建设质量风险进行仿真,判断出项目总体质量风险程度,最后给出相应措施。 The quality risk research evaluation combining expert fuzzy of Zbeng-Xu High-speed Railway Construction Project has been conducted through the evaluation with BP neural network. Firstly an evaluation index system of the project quality risks is established and the expert fuzzy evaluation is adopted in the risk grade assessment of the risk factors in Zheng- Xu High-speed Railway Construction Project to get the evaluation data. Then the established BP neural network is used to simulate the quality risks and judge the overall risk grade in the project. Finally the corresponding measures have been proposed.
作者 刘建宁
出处 《洛阳理工学院学报(自然科学版)》 2014年第3期67-72,共6页 Journal of Luoyang Institute of Science and Technology:Natural Science Edition
关键词 高铁建设 质量风险研究 模糊评价 BP神经网络 high-speed railway construction quality risks research fuzzy evaluation BP neural network
作者简介 刘建宁(1977-),男,河南洛阳人,硕士,助教,主要从事神经网络与数据挖掘方面的研究.
  • 相关文献

参考文献6

二级参考文献33

  • 1韩同银,杜守继.铁路建设项目管理中业主地位和前期决策的作用分析[J].建筑施工,2006,28(3):175-177. 被引量:4
  • 2武乾,武增海,李慧民.工程项目风险评价方法研究[J].西安建筑科技大学学报(自然科学版),2006,38(2):258-262. 被引量:42
  • 3赵峰.基于BP神经网络的项目投资风险评价[J].建筑经济,2006,27(10):62-64. 被引量:12
  • 4PMI. A guide to the project management body of knowledge: PMBOK Guide. 3rd ed [M]. USA: Project Management Institute Inc. 2004.
  • 5AKINTOYE,A. S. Risk analysis and management in construction [ J]. International Journal of Project Management, 1997, 15(1) : 31 -38.
  • 6ZOU P. X. W. , ZHANG G. , WANG J. Understanding the key risks in construction project in China [ J]. International Journal of Project Management, 2007,25(6) : 601 -614.
  • 7ZOU P. X. W. , ZHANG G. , WANG J. Identifying key risks in construction projects: life cycle and stake holder perspectives [J]. In: Proc. 12th Pacific rim real estate society conference, Auckland, New Zealand 2006, ( 1 ) : 22 - 25.
  • 8CANA D. , CRUZ D.A. Integrated methodology for project risk management [ J]. Journal of Construction Engineering and Management, 2002, 128(6) : 473 -485.
  • 9LUU V. T. , KIM S. Y. , TUAN N. V. , et al. Qualitifying schedule risk in construction project using Bayses in belief networks [ J ]. International Journal of Project Management, 2009,27(1) : 39 -50.
  • 10LEE E. , PARK Y. , SHIN J. G. Large engineering project risk management using a Bayesian belief network [ J ]. Expert Systems with Applications, 2009,36 (3) :5880 -5887.

共引文献74

同被引文献2

引证文献1