基于模糊综合评价的高铁工程施工质量风险分析 被引量:15

Fuzzy Analysis of Quality Risks in High-speed Railway Construction
在线阅读 下载PDF
导出
摘要 随着我国高铁的不断发展,需要对其施工质量风险进行研究。借鉴5M1E分析法选取风险评价指标体系,通过采样得到的数据,利用熵值法确定每一项指标的权重。多次计算权重并且对数据的稳定性进行检验,根据标准差可判断数据是较为稳定的。对高铁项目施工质量风险程度进行综合评价,分析评价结果,从高铁新材料和新技术两大方面提出了相应的建议。 With China's high-speed rail development,it is necessary to research on its construction risk.Firstly,a risk assessment system was established according to 5M1E analysis.Secondly,based on the entropy method,the weight of each indicator were determined with the data obtained by sampling.Through calculating weight many times and testing the data's stability,we judge the data is stable by standard deviation.Thirdly,a comprehensive risk evaluation system of high-speed rail project construction quality was built.Some suggestions from new materials and new techniques are presented.
机构地区 西南交通大学
出处 《工程管理学报》 2012年第2期42-45,共4页 Journal of Engineering Management
关键词 模糊综合评价 熵值法 施工质量风险 柯西分布 fuzzy evualtion entropy method construction risk cauchy distribution
作者简介 E—mail:120512855@qq.com.熊竣熙(1990-),男,本科生,研究方向:工程管理; 薛晋(1991-),男,本科生,研究方向:工程管理; 赵冬梅(1960-),女,副教授,研究方向:项目管理与供应链。
  • 相关文献

参考文献11

二级参考文献73

共引文献310

同被引文献125

引证文献15

二级引证文献81

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部