我国太阳能发电开发及消纳相关问题研究 被引量:49

Study on Issues Concerning Solar Power Development and Accommodation in China
在线阅读 下载PDF
导出
摘要 介绍了我国太阳能发电开发规划、布局特点及存在的问题;基于建立的光伏发电出力特性指标,分析了大规模光伏发电并网对电力系统规划提出的新要求;提出了太阳能发电消纳研究方法,根据"十二·五"期间西北地区太阳能发电规划目标,分析了西北电网太阳能消纳能力,2015年,西北地区太阳能发电装机规模为1 320万kW,电网调峰能力不能满足光伏、风电等新能源消纳需求,需要跨区平衡消纳。 The planning, layout characteristics and existing problems of solar power development in China are introduced. Based on the output characteristic index of PV generations, the new requirements of large-scale PV power integration is analyzed on the power system planning, and the analytical method of solar power accommodation is proposed. According to the planning targets of solar power generation of the “12th Five-Year Plan” period in the northwestern region, the solar power accommodation capacity of the northwest grid is studied. It is predicted that by the year of 2015, the installed solar power capacity in the northwestern region will reach 13.2 GW, and the balancing capability of the local power grid can' t meet the accommodation requirement of such new energies as PV and wind power. Trans-region balance is therefore needed for accommodation of new energy.
机构地区 国网能源研究院
出处 《中国电力》 CSCD 北大核心 2013年第1期1-6,共6页 Electric Power
关键词 电力规划 太阳能发电 布局 消纳 power planning solar power generation layout accommodation
作者简介 胡泊(1979-),男,湖南衡阳人,博士,主要从事能源与电力发展战略、规划及能源技术经济等方面的研究。E-mail:hubo@sgeri.sgcc.com.cn
  • 相关文献

参考文献6

  • 1国网能源研究院.2012中国发电能源供需与电源发展分析报告[R],2012.
  • 2中国电力企业联合会.青海太阳能发电调研[R],2011.
  • 3中科院电工研究所.我国太阳能资源及开发利用前景研究[R],2009.
  • 4王锡凡.电力系统优化规划[M]北京:水利电力出版社,1990.
  • 5KAZARLIS S A,BAKIRTZIS A G,PETRIDIS V. A genetic algorithm solution to the unit commitment problem[J].IEEE Transactions on Power Systems,1996,(01):83-92.doi:10.1109/59.485989.
  • 6国网能源研究院.太阳能发电大规模开发与市场消纳研究[R],2012.

同被引文献593

引证文献49

二级引证文献1358

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部