混凝土浇筑期高大模板支架工作状态的试验测试 被引量:24

IN-SITU TEST OF WORKING STATE OF HIGH FALSEWORK DURING CONCRETE PLACEMENT
原文传递
导出
摘要 混凝土浇筑期是高大模板支架最危险的时期,为了了解这一时期的高大模板支架的工作状态,该文对两个模板支架进行了内力的静态和动态实测。测试结果表明:立杆所受到的最大荷载出现在浇筑过程中,而不是在浇筑结束后;支架整体工作;个别立杆在浇筑过程中退出了工作,使得附近立杆的轴力大幅度提高。该文对这一现象进行了分析,根据试验和分析结果,掌握了高大模板支架的工作状态,提出设计时应将混凝土荷载视为可变荷载,并忽略浇筑和振捣混凝土产生的荷载动力效应。 High falseworks are in the most dangerous state during concrete placement.In order to investigate the working state in that period,in-situ static and dynamic tests of member axial forces were carried out in two construction projects.The test results show that the maximum loads on vertical tubes occur during the pouring process,rather than the end of pouring.The falsework works as a whole structure.In addition,a special phenomenon is found that one of measured vertical tubes stops sustaining load gradually,leading to a significant increase of the axial forces of vertical tubes at juxtaposition;this phenomenon was analyzed in this paper.Based on the results of tests and analyses,the working state of high falseworks was addressed.It is suggested that,during concrete placement,fresh concrete load should be treated as a live load and the dynamic effects caused by placing concrete and vibrating concrete can be neglected.
作者 谢楠
出处 《工程力学》 EI CSCD 北大核心 2011年第A01期85-89,共5页 Engineering Mechanics
基金 国家自然科学基金项目(51078018) 住房和城乡建设部安全质量监督专项经费项目(2009-9)
关键词 高大模板支架 混凝土浇注期 工作状态 现场试验 混凝土荷载 high falsework period of concrete placement working state in-situ test concrete load
作者简介 作者简介:谢楠(1965-),女,湖南人,副教授,博士,从事结构设计和可靠度理论研究(E—mail:n_xie@sina.com)
  • 相关文献

参考文献10

  • 1Hadipriono F C, Wang H K. Analysis of causes of formwork failures in concrete structures [J]. Journal of Construction Engineering and Management, ASCE, 1986, 112(1): 112-121.
  • 2北京市工程质量安全监督站. “9.5”重大生产安全事故调查报告[R]. 2005.
  • 3刘家彬,郭正兴.扣件钢管架支模的安全性[J].施工技术,2002,31(3):9-11. 被引量:43
  • 4JGJ130-2001,建筑施工扣件式钢管脚手架安全技术规范[S].北京:中国建筑工业出版社,2002.
  • 5SEI/ASCE37-02, Design loads on structures during construction [S]. 2002.
  • 6ACI 347R-03, Guide to formwork for concrete [S]. 2003.
  • 7Karshenas S, Heinrich S M. Dynamic modeling of slab formwork during concrete placement [J]. Journal of Structural Engineering, ASCE, 1994, 120(7): 2199-2217.
  • 8杨俊杰,顾仲文,章雪峰,金睿.扣件式钢管模板高支撑体系实测分析[J].施工技术,2006,35(2):8-9. 被引量:19
  • 9Huston D R, Fuhr P L, Ambrose T P, Devino E A, Werner M P. Construction load monitoring using instrumented shoring [J]. Proc. SPIE, 1994, 2191: 408-419.
  • 10Huang Y L, Chen W F, Ji H, Chen T Y, Kao Y G, Lin C Q. A monitoring method for scaffold-frame shoring systems for elevated concrete formwork [J]. Computers and Structures, 2000, 78(5): 681-690.