导出
摘要 某城镇综合污水处理厂出水COD、总氮、总磷等指标已不能满足太湖流域污水排放新标准的要求。通过强化预处理、改造生化系统、增加深度处理等一系列工程改造措施,使污水处理厂运行稳定,脱氮除磷效果显著,出水水质能稳定达到《城镇污水处理厂污染物排放标准》(GB18918—2002)的一级A标准和《太湖流域城镇污水处理厂主要水污染物排放限值》(DB 32/1072—2007)中相关要求。 The effluent COD, total nitrogen, total phosphorus and other indicators of a municipal comprehensive wastewater treatment plant (WWTP) could not meet the new discharge standard in Taihu Lake Basin. Thus, a series of measures, such as enhancing the pretreatment, reconstructing the bio- ehemieal system and adding an advanced treatment system, were taken. After those, the WWTP operates stably, and the removal efficiency of nitrogen and phosphorus is obvious. The effluent can meet the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918 -2002) and the requirements of Discharge Limit Values of Water Pollutants for Municipal Sewage Treatment Plants and Key Industries in Taihu Lake Area ( DB 32/1072 - 2007 ).
出处 《中国给水排水》 CAS CSCD 北大核心 2010年第24期85-87,共3页 China Water & Wastewater
关键词 太湖流域 提标改造 脱氮除磷 Taihu Lake Basin upgrading reconstruction nitrogen and phosphorus removal
作者简介 E -lnail: zhang_zhengyong@ 163. com
  • 相关文献

参考文献1

二级参考文献5

共引文献6

同被引文献3

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部