分布式电源对配电网自动重合闸的影响研究 被引量:16

Distributed generation impact to distribution network's auto-reclosing
在线阅读 下载PDF
导出
摘要 含分布式电源的配电网一般为双电源或多电源供电系统,需要对其重合闸方式进行研究,以保证设备安全.以含分布式电源的解列重合闸为例,对系统侧电源重合于永久故障形成的冲击电流进行分析.从机理上讨论了无压检定和同步检定的在含分布式电源系统中的应用.通过仿真验证了无压检定和同步检定重合闸后电流变化过程,并求出分布式电源并网时冲击电流最小的最佳重合闸时间. Distribution networks with distributed generation always presents as dual-power or multi-power supply system,the reclosing mode needs to be researched to ensure the equipments safe.This paper establishes disconnected reclosing system with distributed generation,and analyzes the impulse current when the distribution system recloses with permanent fault.The application of no-voltage test reclosing and the synchronization test reclosing device in the distribution network with distributed generation is investigated.Simulation results verified the no-voltage test and synchronization test reclosing current change processes.The optimal reclosing time is suggested considering reclosing distributed generation with minimum impulse current.
出处 《电力科学与技术学报》 CAS 2010年第1期21-26,共6页 Journal of Electric Power Science And Technology
基金 教育部新世纪优秀人才支持计划(NCET-08-0356)
关键词 分布式电源 自动重合闸 配电网 最佳重合闸时间 冲击电流 distributed generation auto-reclosing distribution network optimal reclosing time impulse current
作者简介 邰能灵(1972-),男,博士,教授,博士生导师,主要从事电力系统保护及安全控制的研究E-mail:nltai@sjtu.edu.cn
  • 相关文献

参考文献11

二级参考文献84

共引文献188

同被引文献204

引证文献16

二级引证文献172

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部