时间-费用相关的随机活动网络仿真研究

Simulation Research of Stochastic Activity Network with Correlative Variables
在线阅读 下载PDF
导出
摘要 针对复杂产品研发项目活动时间、费用不能准确确定,采用蒙特卡罗仿真方法,建立了时间和费用为相关随机变量的随机活动网络仿真模型。利用乔列斯基因子分解法,将独立分布的时间和费用随机变量转化为相关的随机变量,通过对仿真结果的分析,可以更准确地进行时间-费用交换分析,优化项目工期和费用。通过算例说明了仿真建模和分析过程。 Since complex product development project is characteristic of uncertain activity time and cost,the Monte Carlo simulation method can be used to model the stochastic activity network with the correlative stochastic variables of time and cost. Here the method of Cholesky decomposition has been used to convert independent distribution of stochastic variables such as time and cost into correlative stochastic variables. The simulation can accurately and rapidly process the job of time-cost trade-off and obtain optimum project duration and cost. At last,a case study illustrates the modeling and analysis process.
出处 《系统仿真学报》 CAS CSCD 北大核心 2010年第4期864-866,共3页 Journal of System Simulation
基金 国家自然科学基金(70671007) 教育部博士点基金课题(200800060005)
关键词 仿真 随机活动网络 时间-费用交换 蒙特卡罗 simulation stochastic activity network time-cost trade-off Monte Carlo
作者简介 杨宝森(1965-),男,河北枣强,副教授,研究方向为信息系统项目实施与管理; 刘鲁(1947-),女,教授,博导,研究方向为信息系统与知识管理 马晨(1988-),女,研究方向为信息系统项目实施与管理。
  • 相关文献

参考文献7

二级参考文献15

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部