期刊文献+

规划问题编码成SAT问题研究 被引量:1

Research on encoding planning problem into SAT
在线阅读 下载PDF
导出
摘要 智能规划问题是一个NP-hard的问题。近年来,由于在可满足问题(SAT)研究领域取得了较大进展,出现了一大批快速的能达到工业级应用的SATsolver求解器的出现,这使得运用可满足技术来求解规划问题的方法越来越得到智能规划研究者们的重视。用可满足技术求解规划问题的首要任务是必须将规划问题"翻译"成可满足问题。讨论了如何将规划问题编码成命题可满足问题的一般技术,并对"直接编码"和"基于规划图的编码"两种编码技术进行了比较,指出了两种编码技术各自的优缺点。在此基础上,深入地分析了各种不同的编码方案之间的异同点以及它们各自的优缺点。最后,指出了用SAT技术求解规划问题中存在的一些问题以及相关改进方法。 Intelligent planning is a NP-hard problem,and using SAT technology to solve the planning is an important research direction.Recently,great progress has been made on SAT technology,many fast SAT solver has appeared,which lead the planning method based on SAT technology to be a competitive method and attract many researcher's focus.The first problem to be solved when using SAT to solve planning problem is to translate the planning problem into a SAT problem.This paper discusses the general technology on encoding the planning problem into SAT problem,and gives some comparisons between directly encoding method and encoding method based on planning graph.Finally this paper points out some problems exist in current planning technology based on SAT and gives some possible method on how to improve the current planner based on SAT technology.
作者 陈蔼祥
出处 《计算机工程与应用》 CSCD 北大核心 2009年第14期39-45,共7页 Computer Engineering and Applications
基金 国家自然科学基金No.60773201~~
关键词 智能规划 规划图 可满足(SAT)问题 编码方案 intelligent planning planning graph SAT problem encoding schema
作者简介 陈蔼祥(1978-),男,博士,主要研究方向为自动推理、智能规划与诊断。
  • 相关文献

参考文献20

  • 1Bylander T.Complexity results for planning[C]//Proceedings of IJCAI91,1991:274-279.
  • 2Bernhard N.On the computational complexity of temporal projection,planning,and plan validation[J].Artificial Intelligence,1994,66 (1):125-160.
  • 3Wilkins D.Practical planning:Extending the classical AI planning paradigm[M].San Mateo, CA: Morgan Kaufmann, 1988.
  • 4Biundo S,Schattenberg B.From abstract crisis to concrete relief-a preliminary report on combining state abstraction and HTN planning[C]//Proceedings of the European Conference on Planning(ECP), 2001 : 157-168.
  • 5Cun-ie K,Tate A.O-PLAN:The open planning architecture[J].Artificial Intelligence, 1991,52( 1 ) : 49-86.
  • 6Tate A,Drabble B,Kirby R.O-Plan2:An architecture for command,planning and control[M].[S.l.]: Morgan Kaufmann, 1994.
  • 7Aarup M,Arentoft M M,Parrod Y,et al.Optimum-AIV:A knowledge-based planning and scheduling system for spacecraft AIV[M]// Zweben M,Fox M S.Intelligent Scheduling.[S.l.]:Morgan Kaufmann, 1994:451-469.
  • 8Estlin T A,Chien S A,Wang X.An argument for hybrid HTN/operator-based approach to planning[CV/Proceedings of the European Conference on Planning(ECP), 1997: 184-196.
  • 9Agosta J M.Formulation and implementation of an equipment configuration problem with the SIPE-2 generative planner[C]//Proc AAAI-95 Spring Symposium on Integrated Planning Applications, 1995 : 1-10.
  • 10Smith S J J,Hebbar K,Nan D S,et al.Integrating electrical and mechanical design and process planning[C]//Mantyla M,Finger S, Tomiyama T.Knowledge Intensive CAD,Volume2.[S.l.]:Chapman and Hall, 1997 : 269-288.

同被引文献1

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部