大型近水平露天煤矿转向期间开拓运输系统优化研究 被引量:28

Optimization of In-Pit Development Transport System During Transitional Period in Large Open Pit Mine with Flat Coal Deposit
在线阅读 下载PDF
导出
摘要 针对露天煤矿转向期间内排空间不均衡、剥离物运输距离加大的情况,分析了采区间搭桥设置,提出剥离物是否通过桥运输的判别方法和筑路式组沟开拓运输系统的布置形式;研究了反向内排的布置要素.在安太堡露天煤矿进行了实践,结果表明:采区间搭桥、反向内排和筑路式组沟开拓运输系统在大型近水平露天煤矿转向期间有效地解决了内排空间不均衡的问题,缩短了剥离物的运输距离. Aiming at the disproportion in inner dumping space and the increase of transportation distance, we analyzed the bridge set between mining areas, proposed the method to judge whether the overburden is carried or not by bridge and the lay-out of the development transport system of the road-building-ditch-group, and studied the lay-out elements of reverse inner dumping. The practice in Antaibao Surface Coal Mine shows that the three measures can well solve the problems of disproportion in inner dumping space and the increase of transportation distance.
出处 《采矿与安全工程学报》 EI 北大核心 2008年第4期404-408,共5页 Journal of Mining & Safety Engineering
基金 国家“十一五”科技支撑计划项目(2006BAB16B00)
关键词 近水平 露天煤矿 转向 反向内排 采区间搭桥 flat dipping surface coal mine transition reverse inner dumping bridge betweenmining areas
作者简介 周伟(1982-),男,江苏省盐城市人,博士研究生,从事露天采矿、岩土工程与边坡稳定和系统工程方面的研究.E-mail:zhwl9820624@163.com Tel:13815314985