期刊文献+

2008年国际大电网会议系列报道——关于电力系统运行与控制的讨论 被引量:8

A Review of CIGRE 2008 on Power System Operation and Control
在线阅读 下载PDF
导出
摘要 为有序地介绍国际大电网组织(CIGRE)2008年大会上的相关论文,归纳了研究委员会SCC2关于电力系统运行与控制的论文和相关讨论会的内容。讨论集中在3个方面,即运行和控制中的广域测量及其应用、市场环境和较低安全裕度下的运行可靠性、大规模风电对系统运行和控制的影响。 Activities of CIGRE 2008, current status, obstacles and prospective of modern power system operation and control are reviewed in this paper. The main issues include, new applications in system operation and control for detection and mitigation of system conditions; evolution of operation reliability standards in the context of open markets and reduced security margins; impact on system operation and control of the integration of large wind generation.
出处 《高电压技术》 EI CAS CSCD 北大核心 2008年第11期2253-2258,共6页 High Voltage Engineering
基金 国家自然科学基金重大项目(50595413) 国家电网公司科技项目(SGKJ[2007]98&187)资助~~
关键词 CIGRE会议 广域测量系统(WAMS) 广域控制系统(WACS) 大扰动 运行可靠性 风电接入 CIGRE WAMS WACS operation reliability large disturbances impact of wind generation on grid
作者简介 薛禹胜1941-,男,中国工程院院士,总工程师,博士生导师,主要从事电力系统自动化方面的研究工作E—mail:yxue@nari-china.com 李海峰1973-,男,博士,高级工程师,从事电网运行和控制方面的工作Email:lihaif@jsepc.com.cn
  • 相关文献

参考文献3

二级参考文献21

  • 1CISNEIROS S,KAUKONEN T,JONES H.Special report for study committee C2 system operation and control//CIGRE,Aug 28-Sep 1,2006,Paris,France.
  • 2CISNEIROS S J N.Brazilian system security standards:how to maximize transmission system limits with an adequate security evel//CIGRE:C2-101,Aug 28-Sep 1,2006,Paris,France.
  • 3BELL K R W,GREEN N.Security criteria for planning and operation in the new GB market//CIGRE:C2-108,Aug 28-Sep 1,2006,Paris,France.
  • 4DELOURME B,LASNIER A.Minimizing the cost of generation re-dispatching taking into account remedial actions//CIGRE:C2-103,Aug 28-Sep 1,2006,Paris,France.
  • 5BASSI F,FIORINO E.Congestion management in the new market environment:the Italian approach and experience//CIGRE:C2-104,Aug 28-Sep 1,2006,Paris,France.
  • 6DI MARZIO G,FOSSO O B.International grid code developments for wind power turbines and DC interconnectors//CIGRE:C2-105,Aug 28-Sep 1,2006,Paris,France.
  • 7GOMES P,CARDOSO JR G.Reducing blackout risk by system protection schemes:detection and mitigation of system//CIGRE:C2-201,Aug 28-Sep 1,2006,Paris,France.
  • 8BAE J C,JUNG E S.The introduction of special protection schemes (SPS) for increasing interface flow limits in the Korean power system//CIGRE:C2-210,Aug 28-Sep 1,2006,Paris,France.
  • 9PTACEK J,VNOUCEK S.Possibilities of applying phase shifting transformers in the electric power system of the Czech Republic//CIGRE:C2-203,Aug 28-Sep 1,2006,Paris,France.
  • 10AYUEV B,EROKHINE P,KULIKOV Y.IPS/UPS wide area measuring system//CIGRE:C2-211,Aug 28-Sep 1,2006,Paris,France.

共引文献24

同被引文献76

引证文献8

二级引证文献129

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部