盾构扩挖法建造地铁车站的支撑方案优化 被引量:10

Optimization of the Supporting System for Constructing Metro Station by Enlarging Shield Tunnels
在线阅读 下载PDF
导出
摘要 采用盾构扩挖法建造地铁车站的关键问题是支撑方案的选择。选择北京地铁10号线三元桥车站自起始里程开始的18.6 m长的区段作为试验段,进行部分拆除盾构管片后结合明挖法拓展建造地铁车站的方案研究。根据试验段的施工步骤,选取3种方案的最不利工况以及方案3第2道横支撑换撑后在管片开口部位施加附加支撑的3种工况,共6种工况,采用荷载—结构模型,考虑管片和内支撑的共同作用,建立三维有限元模型,对支撑方案进行优化。结果表明:第1道横支撑在施做底部临时支撑后可以拆除;第2道横支撑可以在管片上钻孔一次性架设,也可以先架设在管片外侧,待拆除部分管片后再换撑到隧道内支撑的纵向连接上;第2道横支撑换撑后在管片开口部位不需要施加斜撑和竖撑。 The choice of supporting system is a very important problem for constructing metro station by enlarging shield tunnels. The starting 18. 6 m of Sanyuanqiao Station on Beijing Metro Line 10 is selected as the test section to study the scheme for constructing metro station by enlarging shield tunnel combined with cut-and-cover method, only parts of shield segments are demolished during the construction process. Based on the construction steps of the test section, six load conditions including the most unfavorable conditions of three schemes and the three load conditions of exerting additional supports on the peristome of the segment after the second horizontal support transferred, are selected to calculate and analyze by threedimensional finite element models, in order to put forward useful suggestions and optimize the supporting system. The results indicate that the first horizontal support can be removed after the bottom temporary support is erected. The second horizontal support can be once erected by drilling on the segment, or it can be erected outside the segment firstly, then transferred to the longitudinal link of the inner supporting system of shield tunnel after segments are partly removed. Inclined support or vertical support is not required at the peristome of the segment after the second horizontal support is transferred.
出处 《中国铁道科学》 EI CAS CSCD 北大核心 2008年第5期77-82,共6页 China Railway Science
基金 北京市科技计划项目(D0604003040921)
关键词 隧道 盾构扩挖法 地铁车站 支撑方案 管片 Tunnel Enlarging shield tunnels Metro station Supporting system Segment
作者简介 张新金(1982-),男,湖南邵阳人,博士研究生。
  • 相关文献

参考文献13

二级参考文献12

  • 1Yukinori K. Present and technology of shield tunneling method in Japan [J].Tunneling and Underground Space Technology,2003,18:145-159.
  • 2Frolovl S, Krouk I E. A New concept of building subway shallow lines[C]//Proceedings of the world tunnel congress'98 on tunnels and metropolises. Vol. 1:145-148.
  • 3纳乌莫夫CH 潘昌实译.地下铁道[M].唐山:唐山铁道学院,1959..
  • 4李围 何川.地铁车站盾构法综合技术在我国的应用前景探讨[C].中国土木工程学会快速轨道交通委员会学术交流会 地下铁道专业委员会第十四届学术交流会,2001..
  • 5李围 张志强.利用区间盾构隧道修建三条平行隧道式地铁车站的受力特征分析[C]..中国土木工程学会隧道及地下工程学会地下铁道专业委员会第十五届学术交流会论文选集[C].,2003..
  • 6GB 50108-2001.地下工程防水技术规范[S],2001.
  • 7GB 50007-2002.建筑地基基础设计规范[S],2002.
  • 8刘国琦,杜文库.我国地下工程施工技术的发展及展望[J].建筑技术,1997,28(7):480-483. 被引量:9
  • 9张庆贺,朱忠隆.21世纪地铁施工技术展望[J].施工技术,1999,28(1):9-10. 被引量:24
  • 10李惠平,夏明耀,胡伟伟.多圆形盾构工法及其应用[J].地下工程与隧道,1999(4):31-34. 被引量:2

共引文献51

同被引文献79

引证文献10

二级引证文献97

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部