摘要
作者采用控制爆破技术拆除复杂环境下钢筋混凝土框架结构物。设计与施工中,通过分析钢筋的失稳条件确定了立柱炸高,采用半秒延期雷管组成非电复式闭合起爆网路,使用多层遮挡和覆盖进行飞石防护控制,使拆除爆破达到了预期效果。
In this paper, the controlled blasting technique is adopted to demolish reinforced concrete frame structure in complicated surroundings. During the process of design and construction, the frame stand-off is determined through analyzing the destabilizing conditions of reinforced steel bar. The half-second delay detonators are used to compose a non-electric, compound and closed initiation net, multi -shelter and overcast are also adopted to defend from slung shot, consequently the prospective effect is achieved by demolition blasting and the ambient buildings are all safe and sound.
出处
《煤矿爆破》
2007年第2期33-35,共3页
Coal Mine Blasting
关键词
爆炸拆除
框架结构物
定向倒塌
demolish
reinforced concrete frame
collapse directionally