近距离上部穿越对原有隧道沉降的影响分析 被引量:69

Analysis of the observed longitudinal settlement of a tunnel caused by an adjacent shield tunneling on top
在线阅读 下载PDF
导出
摘要 结合现场监测数据和理论分析,对隧道近距离上穿已有隧道引起的纵向变形过程及其产生原因和机理进行了分析研究。研究发现,在软土层中直径在6m左右的隧道施工,在距离原有隧道10m以外的工况下,对原有隧道纵向沉降基本不会造成影响;穿越过程中,由于土体卸载等原因,已有隧道纵向沉降主要表现为隆起,且后期变化较大;发现隧道上穿后产生的隆起值占最终值近70%,且在10 ̄15天后达到最大值,而后产生少量回落,大约占最终隆起值的15%。研究表明,隧道沉降变化可分为先期沉降、隧道通过时隆起、隧道穿越后一段时间内的隆起和后期沉降4个阶段,且主要变形发生在穿越以后。 Combining monitoring data and theoretical analysis, the process of the longitudinal settlement of an existing tunnel caused by an adjacent shield tunneling on top is studied. It is concluded that when the cross tunneling is more than 10 meters away the settlement caused is negligible. It is also found that in the process of the tunneling on top, due to the unloading of the soil, settlement of the existing tunnel manifests mainly in the form of upheaval. This upheaval during the construction deserves close attention as it may account for almost 69% of the final settlement. The maximum settlement will be reached 10-15 days later after the crossing, and then the upheaval will be reduced by a small amount, about 15% of the final settlement. The results indicate that the settlement process can be divided into four phases: the settlement in advance, the upheaval during the crossing, the upheaval in short-term after the crossing, and the long-term settlement, with the major settlement occuring mainly after the crossing.
出处 《土木工程学报》 EI CSCD 北大核心 2006年第6期83-87,共5页 China Civil Engineering Journal
基金 国家自然科学基金(50279032) 新世纪优秀人才支持计划
关键词 盾构隧道 近距离上部穿越 纵向沉降 shield tunnel adjacent upper cross tunneling longitudinal settlement
作者简介 陈亮,硕士研究生 E-mail:a.chen@126.com
  • 相关文献

参考文献8

二级参考文献19

  • 1丁春林,朱世友,周顺华.地应力释放对盾构隧道围岩稳定性和地表沉降变形的影响[J].岩石力学与工程学报,2002,21(11):1633-1638. 被引量:42
  • 2叶玲玲.招商局广场基坑开挖监测分析研究[J].同济大学学报,1998,26:122-126.
  • 3[5]Yamaguchi I, Yamazaki I, and Kiritani Y. Study of ground-tunnel interactions of four shield tunnels driven in close proximity, in relation to design and construction of parallel shield tunnels[J]. Tunnelling and Underground Space technology, 1998, 13:289~304.
  • 4[6]Lee K M, Rowe R K. An analysis of three-dimensional ground movements: the Thunder Bay tunnel[J]. Canadian Geotechnical Journal,1991,28:25~41.
  • 5Nomoto T, Imamura S, Hagiwara T, et al. Shield tunnel construction in centrifuge[J]. J Geotech. & Geoenvir. Eng., 1999, 125:289~300.
  • 6Yamaguchi I, Yamazaki I and Kirimni Y. Study of groundtunnel interaction of four shield .Tunnels driven in close proximity ,in relation to design driven in close proximity ,in relation to design and construction of parallel shield tunneld.Tunneling and underground space technology, 1998,23(3):289 - 304.
  • 7Soliman E,Duddeck H and Ahrens H.Two- and three - dimensional analysis of closely spaced double - tube tunnels.Tunneling and underground space technology, 1993,8(1):13 - 18.
  • 8曾小清,张庆贺,曹志远.地铁工程双线盾构平行推进的相互作用[J].同济大学学报(自然科学版),1997,25(4):386-389. 被引量:24
  • 9阮林旺,李永盛.软土盾构法施工引起相邻桩体变形和受力研究[J].隧道及地下工程,1997,18(3):18-23. 被引量:19
  • 10阳军生,刘宝琛.挤压式盾构隧道施工引起的地表移动及变形[J].岩土力学,1998,19(3):10-13. 被引量:62

共引文献339

同被引文献387

引证文献69

二级引证文献585

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部