摘要
2004年底,国家电网公司提出了发展特高压输电的战略目标。介绍了2005年以来,国家电网公司发展特高压输电的论证经过以及开展特高压输电论证研究的重要性和必要性,交流特高压输电试验示范工程选择和金沙江送出方案的论证过程,以及运行电压选择、环境保护、过电压及绝缘等特高压关键技术的研究结论。说明了特高压输电的论证过程是科学、民主的,论证成果是科学、可靠的,为我国发展特高压输电提供了坚强的技术支撑。
At the end of 2004, State Grid Corporation of China (SGCC) put forward the strategic objective of developing UHV power transmission. Here, the demonstration process of developing UHV power transmission in China by SGCC since 2005 and the significance and necessity of carrying out such demonstration, the selection of demonstration project for UHV AC power transmission and the demonstration process of UHV DC power transmission from Xiluodu and Xiangjiaba hydropower stations in Jinsha River valley, as well as the research results on the key technologies of UHV power transmission, for instance the selection of voltage class for UHV power transmission, environment protection, AC overvoltage, etc., are presented. Above-mentioned substances show that the research and demonstration processes are scientific and democratic, the results of research and demonstration are reasonable and reliable, and these results can give strong and vigorous supports for the construction of domestic UHV power transmission.
出处
《电网技术》
EI
CSCD
北大核心
2006年第5期1-12,共12页
Power System Technology
关键词
特高压输电
论证
试验示范工程
过电压与绝缘配合
Ultra high voltage power transmission
Research and demonstration
Test and pilot project:Overvoltage and insulation coordination
作者简介
舒印彪(1958-),男,国家电网公司副总经理、党组成员;
刘泽洪(1961-),男,硕士,国家电网公司特高压办公室副主任,从事特高压输电工程的建设管理和研究工作;
袁骏(1971-),男,硕士,从事特高压输电工程的建设管理和研究工作;
陈葛松(1971-),男,博士,从事特高压输电工程的建设管理和研究工作;
高理迎(1963-),男,博士,从事特高压输电工程的建设管理和研究工作.