期刊文献+

广州石牌桥地铁车站深基坑信息化施工与分析 被引量:18

Analysis and information construction of foundation pit for Shipaiqiao subway station in Guangzhou
在线阅读 下载PDF
导出
摘要 广州市石牌桥地铁车站主体基坑维护结构采用密排人工挖孔桩,通过优化计算分析确定桩间距为2.0m的疏排人工挖孔桩加内支撑方案。但是,该基坑处于广州市繁华地段,基坑周边环境复杂,针对该基坑布置详细的监测方案,较全面的获得有关数据,并确保了基坑的安全施工。 The continuous cut-cast pile is adopted for the foundation pit of Shipaiqiao Subway Station in Guangzhou city. The optimal calculation has been made for the sparse piles with 2.0 m distance between the neighboring piles of Ф 1200 mm while the foundation safety is guaranteed. The monitoring design is brought out in detail in order to guarantee foundation safety on account of complex environment around the foundation; the comprehensive data are gotten and used for construction.
出处 《岩土力学》 EI CAS CSCD 北大核心 2005年第11期1837-1840,1861,共5页 Rock and Soil Mechanics
关键词 疏排桩 主体结构 优化分析 监测 sparse pile main structure optimal analysis monitoring
作者简介 安关峰,男,1970年生,博士后,高级工程师,主要从事岩土工程旌工、数值仿真和城市信息化研究工作。E-mail:anguanfeng@263.net
  • 相关文献

参考文献6

  • 1连长江 杨冠松.广州市轨道交通三号线详细勘察阶段岩土工程勘察报告[R].广州:广东省重工建筑设计院,2002..
  • 2GJB02-98.广州地区建筑建筑基坑支护技术规定[S].[S].,..
  • 3刘立 刘启峰.广州市轨道交通三号线车站土建招标设计文件[Z].广州:铁道第二勘察设计院(广州分院),2002..
  • 4JGJ120-99.建筑基坑支护工程技术规程[S].[S].,..
  • 5JGJ/8-97.建筑变形测量规程[S].[S].,1998..
  • 6GB50026-93.工程测量规范[S].[S].,..

共引文献180

同被引文献67

引证文献18

二级引证文献178

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部