摘要
无煤柱开采沿空留巷是我国采煤技术发展方向。近几年来,为了探求合理的巷旁支护方法,几个矿区试验了高水速凝泵送充填新技术。本文主要介绍了巷旁充填技术的进展及实践经验。
No coal pillar mining with reuesed roadway is a coal mining technical development tendency in China coal. Over the pass 40 years, personnel from research institutions, colleges and schools, and coal mines have done a lot of research and test work on support of reused roadway. Certain results have been obtained from the research and test work which have played a certain role in coal production. The previous supporting technology did not well developed and the main causes are as fallowings, such as unsufficient support resistances, relationship between yield and roof-floor convergence, heavy haulage, high labour and high cost. In order to to chnage the above stated, and search a new technology, some trial on high-water content, quick setting pumping material for filling reused roadway have been made in some coal mines. This paper is to introduce the principle and practice of the new technology.
出处
《煤炭科学技术》
CAS
北大核心
1993年第3期2-6,共5页
Coal Science and Technology