期刊文献+

Deformation failure mechanism and application of the backfill along the goaf-side retained roadway 被引量:7

Deformation failure mechanism and application of the backfill along the goaf-side retained roadway
在线阅读 下载PDF
导出
摘要 In order to determine the rational width of backfill in the goaf-side retained roadway, the deformation failure mechanism of surrounding rock in retained roadway is studied in the use of theoretical analysis, numerical simulation, etc., when the width of backfill is different. The results show that: with the increase of backfill width, the roof deformation above the backfill decreases; the outside of backfill obviously suffers from greater stress compared to the inner side of backfill; the damage firstly appears in the intersection of top backfill and roof; the plastic failure area is mainly distributed in the roof and floor of inside the roadway; 2 m wide backfill in the goaf-side retained roadway can meet the requirements of roadway deformation. Based on the original combination support of "anchor-mesh-belt-lock" in the haulage-track roadway, the study also considers the reinforced support of "anchor-mesh-belt" above the backfill, and 50 m ahead of working face, and 200 m behind the working face. This kind of support achieves a good result. The roadway deformation of field measurement shows that it can satisfy the need of the next working face. In order to determine the rational width of backfill in the goaf-side retained roadway, the deformation failure mechanism of surrounding rock in retained roadway is studied in the use of theoretical analysis, numerical simulation, etc., when the width of backfill is different. The results show that: with the increase of backfill width, the roof deformation above the backfill decreases; the outside of backfill obviously suffers from greater stress compared to the inner side of backfill; the damage firstly appears in the intersection of top backfill and roof; the plastic failure area is mainly distributed in the roof and floor of inside the roadway; 2 m wide backfill in the goaf-side retained roadway can meet the requirements of roadway deformation. Based on the original combination support of 'anchor-mesh-belt-lock' in the haulage-track roadway, the study also considers the reinforced support of 'anchor-mesh-belt' above the backfill, and 50 m ahead of working face, and 200 m behind the working face. This kind of support achieves a good result. The roadway deformation of field measurement shows that it can satisfy the need of the next working face.
出处 《International Journal of Mining Science and Technology》 SCIE EI 2013年第3期329-335,共7页 矿业科学技术学报(英文版)
基金 Financial support for this work was provided by Chinese National 863 High Technology Plan (No. 2012AA062101) the Priority Academic Program Development of Jiangsu Higher Education Institutions (No. SZBF2011-6-B35) the Graduate Students Innovation Fund of Colleges and Universities in Jiangsu Province (No.CXZZ12_0950)
关键词 Goaf-side retained roadway Roadway-side backfill Reinforced support Numerical simulation Formwork support Goaf-side retained roadway Roadway-side backfill Reinforced support Numerical simulation Formwork support
  • 相关文献

参考文献13

二级参考文献76

共引文献1422

同被引文献103

引证文献7

二级引证文献145

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部