期刊文献+

炼钢连铸混合智能优化调度方法及应用 被引量:12

Hybrid intelligent optimal scheduling method for steelmaking and continuous casting and its application
在线阅读 下载PDF
导出
摘要 针对多阶段、多设备以及精炼工序重数不同的炼钢连铸生产调度问题,建立了综合考虑工序设备指派和作业时间安排的非线性规划模型,提出了基于专家系统的设备指派、基于人机交互的邻域搜索与基于模型转换的时间优化相结合的三阶段炼钢连铸混合智能优化调度方法.该调度方法应用于国内某大型钢厂的生产调度,在减少钢水冗余等待时间、提高设备负荷率方面获得显著成效. A non-linear programming model is established which considers both assignment of machine and time arrangement for the production environment with multi-stage,multi-machine and different refining number.A hybrid intelligent optimal scheduling method is presented which included assignment of machine based on expert system,neighborhood search based on man-machine interaction,and time optimization based on model conversion.Finally,the scheduling method is successfully applied to a large steel plant.Applied resu...
出处 《系统工程学报》 CSCD 北大核心 2010年第3期379-386,共8页 Journal of Systems Engineering
基金 国家自然科学基金重点资助项目(60534010) 高等学校学科创新引智计划资助项目(B08015)
关键词 炼钢连铸 生产调度 智能优化 邻域搜索 steelmaking and continuous casting production scheduling intelligent optimization neighborhood search
  • 相关文献

参考文献10

  • 1李霄峰,徐立云,邵惠鹤,任德祥.柔性炼钢连铸仿真调度系统及其关键技术[J].系统仿真学报,2002,14(2):207-210. 被引量:10
  • 2孙福权,崔建江,汪定伟.模糊作业时间的并行多机调度问题与算法研究[J].系统工程学报,2001,16(2):95-99. 被引量:7
  • 3Lixin Tang,Wenxin Liu,Jiyin Liu.A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment[J]. Journal of Intelligent Manufacturing . 2005 (3)
  • 4Xuan H,Tang L X.Scheduling a hybrid flowshop with batch production at the last stage. Computer and Operation Re-search . 2007
  • 5Pacciarelli D,Pranzo M.Production scheduling in a steelmaking-continuous casting plant. Computers and Chemical En-gineering . 2004
  • 6Tang Li-xin,Luh Peter B,Liu Ji-yin,et al.Steel-making process scheduling using Lagrangian relaxation. International Journal of Production Research . 2002
  • 7Harjunkoski I,Grossmann I E.A decomposition approach for the scheduling of a steel plant production. Computers and Chemistry . 2001
  • 8Numao M,Morishita S.Cooperative scheduling and its application to steelmaking process. IEEE Transactions on Industrial Electronics . 1991
  • 9Vikas K,,Shashi K,Tiwabi MK,et al.Aucton-based approach to resolve the scheduling problem in the steel making process. International Journal of Production Research . 2006
  • 10Morishita,S.,Numao,M.,Tozawa,Y.A scheduling expert for steel-making process by cooperative scheduling. Journal of Japanese Society for Artificial . 1990

二级参考文献6

共引文献15

同被引文献124

引证文献12

二级引证文献81

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部