摘要 针对完整坚硬岩隧道地质特征,总结了TBM施工所面临的风险和挑战,并提出了应对措施和方法。研究表明,通过对刀盘刀具、TBM结构等进行适用性设计,可以一定程度提高TBM刀盘刀具的耐磨性及TBM结构的稳定性,提高设备使用寿命;通过增大TBM推力储备,可以增大TBM掘进贯入度,从而提高掘进速度;通过合理选择TBM掘进参数、科学的设备维护保养、提供良好的作业环境等,可以一定程度提高TBM施工利用率及掘进效率。 According to the geological characteristics of complete hard rock tunnel,this paper summarized the risks and challenges faced by TBM construction,and put forward the countermeasures and methods.The research shows that the wear resistance of the cutter and the stability of the TBM structure can be improved to a certain extent and the service life of the equipment can be improved through the applicability design of the cutter and TBM structure.By increasing TBM thrust reserve,TBM penetration can be increased to improve the driving speed.Through reasonable selection of TBM tunneling parameters,scientific equipment maintenance,and providing a good working environment,TBM construction utilization rate and tunneling efficiency can be improved to a certain extent.
作者 王宝友 WANG Baoyou(China Railway 18th Bureau Group Co.Ltd.,Tianjin 300222,China)
出处 《铁道建筑技术》 2020年第S01期76-79,91,共5页 Railway Construction Technology
基金 中国铁建股份有限公司科技研发计划项目(17-B04-1)
关键词 完整坚硬岩 TBM 适应性 措施 intact hard rock TBM adaptability measure
作者简介 王宝友(1970-),男,河北滦县人,教授级高级工程师,主要从事TBM施工技术研究,E-mail:674643139@qq.com