摘要 某炼化企业加氢型酸性水处理装置于2020年8月建成开工投用,设计规模为120 t/h。同年12月发现侧线系统二级冷凝器E106管束内漏,堵管15根后重新投用。次年1月再次发生管束内漏,进行了管束更换,材质升级为06Cr19Ni10。在此期间检测发现,该冷凝器壳程底部出口管线以及下游分液罐V107底部排液线减薄明显,择机将材质升级为06Cr19Ni10。分析发现,腐蚀主要为NH_(4)HS水溶液腐蚀+冲刷腐蚀,尤其是在弯头外侧和冷凝器壳程出口附近高流速部位,冲刷腐蚀最为严重。腐蚀的主要原因是侧线系统运行负荷远远超出设计能力、氨氮浓度长期超出设计值和操作不当等。最终,通过针对性地升级材质和优化运行负荷,腐蚀情况得到明显缓解和控制。 The hydrogenated type sour water treatment unit of a certain refinery enterprise was completed and put into operation in August 2020,with a design scale of 120 t/h.In December of the same year,it was discovered that there was internal leakage in the E106 tube bundle of the secondary condenser of the side line system,and 15 tubes were blocked before being put back into use.In February of the following year,there was another internal leakage in the tube bundle,and the tube bundle was replaced with an upgraded material of 06Cr19Ni10.During this period,it was found that the outlet pipeline at the bottom of the condenser shell side and the discharge line at the bottom of the downstream knockout tank V107 had significantly reduced thickness,the material was upgraded to 06Cr19Ni10 at an appropriate time.Analysis shown that the main types of corrosion are ammonium thiohydride aqueous solution corrosion and erosion corrosion,especially in the high flow velocity areas on the outer side of the elbow and near the outlet of the condenser shell where have the most severe erosion corrosion.The main reasons for corrosion are that the operating load of the siding system far exceeds the design capacity,the ammonia nitrogen concentration exceeds the design value for a long time,and improper operation.By upgrading materials and optimizing operating loads in a targeted manner,the corrosion situation was significantly alleviated and controlled.
作者 刘峰 Liu Feng(Zhongke(Guangdong)Refinery&Petrochemical Co.,Ltd.,Zhanjiang,Guangdong 524076)
出处 《炼油技术与工程》 CAS 2024年第3期36-39,共4页 Petroleum Refinery Engineering
关键词 酸性水汽提装置 侧线系统 腐蚀 换热器 管道 流速 NH4HS 材质 sour water stripping unit side line system corrosion heat exchanger pipeline flow veloci-ty ammonium thiohydride material
作者简介 刘峰,工程师,2002年毕业于中国石油大学(华东)化工机械与设备专业,从事炼化企业设备管理工作。联系电话:13729072875,E-mail:liufeng.zklh@sinopec.com。
  • 相关文献

参考文献3

二级参考文献21

  • 1刘忠生,方向晨.炼油厂酸性水处理技术的应用和研究发展[J].当代化工,2006,35(2):134-138. 被引量:29
  • 2Thiele R,Brettshneider O,Repke J U,et al.Experimental investigations of foaming in a packed tower for sour water stripping[J].Ind Eng Chem Res,2003,42(7):1426-1432.
  • 3Hafiz M H,Majed R A,Noor R S,et al.Phenylenediamine as inhibitor in sour water at oil refinery[J].Int J Electrochem Sci,2013,8(12):12402-12416.
  • 4Sujo-nava D,Scodari L A,Slater C S,et al.Retrofit of sour water networks in oil refineries:A case study[J].Chem Eng Process,2009,48(4):892-901.
  • 5Nagpal S.Fine tune the design of sour-water strippers using rate-based simulation[J].Chem Eng,2014,121(6):42-45.
  • 6Addington L,Fitz C,Lunsford K,et al.Sour Water:Where it comes from and how to handle it[EB/OL].[2015-11-25].http://www.bre.com/Support/TechnicalArticles/GasTreating/tabid/147/xmmid/434/xmid/21826/xmview/2/Default.aspx.
  • 7Weiland R H,Hatcher N A.Sour water strippers exposed[C]//The 62 th Annual Laurence Reid Gas Conditioning Conference,Norman:University of Oklahoma,2012:285-298.
  • 8Ponting J,Kister H Z,Nielsen R B.Trouble shooting and solving a sour-water stripper problem[J].Chem Eng J,2013,120(11):28-28.
  • 9Ibrahim H A H.Fouling of heat exchangers[M]//Katsikis V N.MATLAB-A fundamental tool for scientific computing and engineering applications-volume 3.Rijeka:InTech,2012:57-96.
  • 10王航空,张梅,杨洋,李兴明.延迟焦化装置含硫污水治理措施与建议[J].石油炼制与化工,2011,42(9):83-86. 被引量:18

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部