机电管道安装工程中BIM管理系统的应用研究 被引量:4

Application Research of BIM Management System in Electromechanical Pipeline Installation Engineering
在线阅读 下载PDF
导出
摘要 机电技术是一门涵盖多个学科的技术,机电安装程序繁琐和精细,对技术要求高,实施工序多,设备系统多,针对这些特点,以BIM技术为核心,研发BIM管理系统,在设计阶段进行深化设计,方便施工,在施工阶段可以对物料进行全方位追踪,实时监控物料状态和数量,可以及时发现问题,保证工期,也对后期运维管理也提供了良好的基础,显著提高了工程管理水平。 Electromechanical technology is a technology covering multiple disciplines.The electromechanical installation procedure is cumbersome and detailed.It has high technical requirements,many implementation procedures and many equipment systems.For these characteristics,we use BIM technology as the core to develop BIM management system.The stage is deepened and designed to facilitate construction.During the construction phase,materials can be tracked in all directions,and the status and quantity of materials can be monitored in real time.Problems can be found in time,the construction period can be guaranteed,and the operation and management of the later operation is also provided.Engineering management level.
作者 李鑫 蒋绮琛 于鑫 陈滨津 LI Xin;JIANG Qichen;YU Xin;CHEN Binjin(China Construction Eighth Engineering Bureau Co.,Ltd.,Shanghai 200122,China)
出处 《施工技术》 CAS 2019年第S01期343-346,共4页 Construction Technology
基金 国家重点研发计划:绿色施工与智慧建造关键技术(2016YFC0702100).
关键词 建筑信息模型 机电管道安装 工程管理 模型轻量化 系统管理 building information modeling(BIM) electromechanical pipe installation engineering management model weight reduction system management
作者简介 李鑫,BIM工程师,工程师,E-mail:444544793@qq.com
  • 相关文献

参考文献8

二级参考文献28

  • 1何涛,李士才,孙钦伟,唐卫清.面向设计制造一体化的管道预制管理信息系统[J].计算机辅助设计与图形学学报,2004,16(11):1613-1616. 被引量:8
  • 2戚发明,胡淑凤.管道预制一体化解决方案综述[J].石油化工建设,2007,29(1):17-20. 被引量:4
  • 3Korman T M,Fischer M A,Tatum C B. Knowledge and reasoning for MEP coordination[J].Journal of Construction Engineering and Management,2003,(06):627-634.
  • 4Foms-Samso F,Bogus S M,Migliaccio G C. Use of Building Information Modeling (BIM) in facilities management[M].Canada:Ottawa,2011.
  • 5Sciences N I O B. National Building Information Modeling Standard Verion1-Part1:Overview,Principles,and Methodologies[M].America,2007.
  • 6Korman T M,Tatum C B. Prototype tool for mechanical,electrical,and plumbing coordination[J].Journalof Computing in Civil Engineering,2006,(01):38-48.
  • 7Korman T M,Simonian L,Speidel E. Using building information modeling to improve the mechanical,electrical,and plumbing coordination process for buildings[M].Denver,United states,2008.
  • 8Leite F,Akcamete A,Akinci B. Analysis of modeling effort and impact of different levels of detail in building information models[J].Automation in Construction,2011,(05):601-609.
  • 9Khanzode A,Fischer M,Reed D. Benefits and lessons learned of implementing Building Virtual Design and Construction (VDC) technologies for coordination of Mechanical,Electrical,and Plumbing (MEP) systems on a large Healthcare project[J].Electronic Journal of Information Technology in Construction,2008.324-342.
  • 10Riley D R,Varadan P,James J S. Benefit-cost metrics for design coordination of mechanical,electrical,and plumbing systems in multistory buildings[J].Journal of Construction Engineering and Management,2005,(08):877-889.doi:10.1061/(ASCE)0733-9364(2005)131:8(877).

共引文献242

同被引文献18

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部