                    结合仁和水库3号输水隧洞现场情况和资源的投入,通过施工方法创新,合理的工序搭接,缩短主要工序的循环,在保证安全和质量的前提下提高了混凝土浇筑速度。
                
                Combined with the site situation and resources input of No.3 water conveyance tunnel of Renhe Reservoir,through innovative construction methods,reasonable process overlap,shorten the cycle of main process,and improve the concrete pouring speed on the premise of ensuring safety and quality.
    
    