基坑支护是基坑工程施工极为关键的环节,基坑支护技术的选择一定要合理、科学,而施工质量也要严格控制。结合曹县人民医院医技综合楼深基坑工程,通过对工程场周边环境及工程条件进行了具体的分析,采用钻孔灌注桩与旋喷桩的支护方案,并对钻孔灌注桩与旋喷桩的施工质量控制进行探讨,取得较好支护效果。
Foundation pit support is an extremely critical link in foundation pit engineering construction,the selection of foundation pit support technology must be reasonable and scientific,and the construction quality must be strictly controlled.Based on the deep foundation pit project of the medical technology complex building of caojun county people’s hospital,this paper analyzes the surrounding environment and engineering conditions of the project field,adopts the support scheme of bored pile and rotary grouting pile,and probes into the construction quality control of bored pile and rotary grouting pile.
作者
陈伟
王春鹏
CHEN Wei;WANG Chunpeng(The Tenth Engineering Co.,Ltd.of CCCC Fourth Highway Engineering Co.,Ltd.,Beijing 101101,China)
出处
《施工技术》
CAS
2020年第S01期196-198,共3页
Construction Technology
关键词
深基坑
支护
钻孔灌注桩
旋喷桩
施工技术
deep foundation excavation
supports
bored pile
rotary jet pile
construction
作者简介
陈伟,工程师